Laserfiche WebLink
<br />o <br /> <br />o <br /> <br />o <br /> <br />.- <br /> <br />municipal permits. Managed site investigation and remediation projects including technology reviews, <br />work plan reviews, and compliance issues. <br /> <br />Ed ucation/Certifications <br />· University of Minnesota, Minneapolis, MN, B.S., 1986 <br />· FEMA Certified NMS <br />· USACE, Construction Quality for Contractors, 2001 <br />· AHERA Contractor/Supervisor, 1995-present <br />· AHERA Building Inspector, License #C3136 <br />· Lead-Based Paint Risk Assessor, License #MEC/LRA 0007 <br />· OSHA Authorized Trainer, Construction Safety (2001) <br />· Hazwoper 40-hour training certificate (2002) <br /> <br />QUALITY CONTROL <br /> <br />Michael A. Lee, Quality Control System Manager <br /> <br />Management Responsibilities <br />Mr. Lee, a 12-year veteran of Ceres, manages many of Ceres' heavy equipment and dirt-moving projects, <br />including recent work on Louisiana levees. Mr. Lee has completed levee repairs on time for the U.S. Army <br />Corps of Engineers. In addition, Mr. Lee is responsible for all phases of work regarding Ceres' <br />environmental projects. This includes Phase I due diligence assessments, sampling methodology <br />expertise of hydrocarbons, solvents, and pesticides/herbicides; supervision of environmental projects <br />including risk based site assessment and evaluation; designing and conducting remedial investigations <br />(Rls), soil vapor extraction, vacuum enhanced free product recovery, and air sparing pilot tests; and <br />implementing corrective action design technologies, environmental regulatory compliance expertise and <br />construction quality control management. Mr. Lee is also project manager for petroleum and chemical <br />release sites as well as selective land clearing, and demolition projects including asbestos, lead, and PCB <br />abatement. Responsible for preparation of environmental and site monitoring reports, project submittals, <br />project invoicing, and project modification proposals. <br />Professional Experience <br />· Mr. Lee managed the time-critical levee reconstruction projects in Louisiana that Ceres performed for <br />the U.S. Army Corps of Engineers. He managed the repair of 12.2 miles of levee in St. Bernard <br />Parish in Louisiana, raising the elevation of the levee by four feet, achieving the deadline while <br />accomplishing all aspects of the projects: buying the fill dirt, permitting the site, excavating, trucking <br />and delivery, and placing and grading using GPS-equipped dozers. <br />· Supervised contractors during excavation of 6,000 cubic yards of solvent and PCB impacted soil, <br />UST excavations, and installation of pump, treatment, and soil vapor extraction remediation systems. <br />Performed 72-hour pumping test and soil vapor extraction pilot test. Prepared petroleum <br />contaminated soil land treatment applications, excavation reports, remedial investigation reports, and <br />site monitoring reports following MPCA LUST Program guidelines. Prepared site closure request <br />letters. <br />· Designed and conducted remedial investigations at soil and ground water contamination sites and <br />prepared remedial investigation reports. Managed LUST projects including UST removals, petroleum <br />contaminated soil removal and treatment, and preparing reports. Prepared Petrofund reimbursement <br />applications. Conducted Phase I due diligence investigations and Phase II environmental <br />investigations including asbestos surveys and collection of wipe samples for PCB analysis. <br />Conducted remedial investigations at facilities with coal tar contamination. Supervised excavation of <br />25,000 cubic yards of soil impacted with creosol, coal tar, and PAHs. Contributed to SPCC plan <br />preparation. Conducted soil probe investigations involving sampling and field screening of subsurface <br />media. Proficient with ASTM soil classification, and utilized word processing, spreadsheet, and <br />modeling software applications. <br />· Performed field sampling of soil, ground water, and other media for chemical, biological, and physical <br />parameters. Project types included remedial investigations and corrective actions at UST, AST, <br />CERCLA, RCRA, Agchem, Storm Water, and Asbestos Survey sites. Experienced with calibration <br /> <br />C~RB~S <br /> <br />Tab B. General Information <br />Section B.6 Key Personnel Resumes <br />Page 7 of 22 <br />