My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tag Grinding Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 08-07-01 Emergency Debris Clearing and Removal
>
Responses
>
Tag Grinding Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2011 4:42:50 PM
Creation date
3/25/2011 4:39:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Emergency Debris
Bid No. (xx-xx-xx)
08-07-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />() <br /> <br />· Presentation of an event-specific detailed operations plan to City officials. <br />· Assignment of inspectors. <br />· Conduct safety and operations meetings. <br />· Begin measurements of haul vehicles. <br />· Begin load and haul operations. <br />· Begin reduction operations. <br />· Deliver initial project status report. <br /> <br />After the initial 24 hours, TAG Grinding Services, Inc.'s managers will coordinate with local <br />authorities to determine areas of priority. The documentation crew will document existing <br />conditions in these areas of debris collection and consolidation and reduction will begin. <br />Throughout the entire process, TAG Grinding Services, Inc.'s managers will be readily available <br />to respond to any change in plans as requested by the City's designated representatives. All <br />activities will be documented on daily reports and a copy of each daily report will be provided to <br />the City the following day. <br /> <br />Daily, or as requested, TAG Grinding Services, Inc. managers will meet with the City to review <br />progress, concerns and any changes in priorities. <br /> <br />o <br /> <br />Every Friday, all subcontractors working directly for TAG Grinding Services, Inc. will be paid for <br />the work they have accomplished the previous week. A release is signed upon receipt of <br />payment and this release will be available to the City is requested. With this guarantee, the <br />subcontractors that work with TAG Grinding Services, Inc. will perform their jobs safely and <br />quickly to insure a timely conclusion to the debris operation. Although weekly payments are <br />not the norm for most prime contractors, TAG Grinding Services, Inc. has found that paying <br />subcontractors on a weekly basis assures the acquisition and retention of the best <br />subcontractors available. <br /> <br />PROJECT MANAGEMENT <br /> <br />o <br /> <br />A. lYPICAL CREW COMPOSmON <br />1. Pickup Crew <br />a. Site Supervisor <br />b. Loader Operator <br />c. 3-5 Trucks <br />d. Ground Crew of 1-2 people <br />e. Traffic Control <br />2. Temporary Storage Facility <br />a. Site Supervisor <br />b. Tower Observer <br />c. 3 Equipment Operators <br />d." Traffic Control <br />3. Reduction Site <br />a. Site Supervisor <br />b. 2 Equipment Operators <br />c. Maintenance Personnel <br />d. Traffic Control <br />4. Rnal Disposal <br />a. Site Supervisor <br />b. Loader Operator <br />c. Trucks (# and size as needed) <br />d. Traffic Control <br />
The URL can be used to link to this page
Your browser does not support the video tag.