My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DRC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 08-07-01 Emergency Debris Clearing and Removal
>
Responses
>
DRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2011 4:58:00 PM
Creation date
3/25/2011 4:56:28 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Emergency Debris
Bid No. (xx-xx-xx)
08-07-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />o <br /> <br />o <br /> <br />o <br /> <br />arrival on the scene. In addition, the Mobile Command Center is self-sufficient and capable of <br />running for days with its own electrical generator, toilet facilities and 400-gallon fuel tank. <br /> <br />Equipment Transportation <br />ORC and/or subcontractor and affiliate over-the-road equipment transports and operators will <br />conduct equipment transportation. <br /> <br />Personnel Transportation <br />The ORC Project Mobilization Team may be air lifted to the designated location by company <br />and/or subcontractor and affiliate aircraft. Management vehicles will provide transportation for <br />other company personnel. <br /> <br />Safetv Briefin2s and Inspections <br />The company Safety Officer will conduct a safety briefing and personal protective equipment <br />check prior to the departure of any personnel to ensure compliance with the Accident Prevention <br />Plan as part of the Safety Plan. <br /> <br />At the Staging Area, Safety Officers will inspect all equipment before allowing it to be <br />mobilized. A Safety Report on equipment, personnel, and PPE will be provided to the <br />GOVERNMENT. <br /> <br />Temporary Housin2 and Subsistence Support <br />Company headquarters personnel will secure temporary housing by the following priority of <br />choice: <br />. Rental Property <br />. Efficiency Lodging rooms <br />. Non-efficiency lodging rooms <br />. Company or rental motor homes and/or travel trailers. <br />Company headquarters personnel will secure temporary sanitary facilities III the event such <br />facilities are inoperable in the effected area. <br /> <br />Company headquarters personnel will assure a reliable and safe supply of food and potable water <br />for consumption by all personnel assigned to the field. <br /> <br />Company headquarters personnel establish and maintain an "Emergency Contact List", to <br />include key medical infonnation for all field personnel to ensure compliance with the Corporate <br />Accident Prevention Plan as part of the Corporate Safety Plan. <br /> <br />Emer2enCy Base Camp <br /> <br />If the consequences of a disaster render the affected area incapable of accommodating basic <br />needs such as housing, food, water, fuel, and sanitary facilities, ORC's team is fully prepared and <br />capable to establish Emergency Base Camps to house and support as many as 1000 disaster <br />response personnel. ORC has extensive experience supporting governmental agencies in <br />emergency response having participated in over 70 emergency response events. ORC <br />Emergency Services' resources will be augmented by experienced management and logistics <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.