My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />- <br /> <br />1"'"1 <br /> <br />. <br /> <br />1"'"1 <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />.., <br />. <br /> <br />" <br />. <br /> <br />,.., <br />. <br /> <br />,., <br />. <br /> <br />., <br />. <br /> <br />II <br /> <br />. <br /> <br />.., <br /> <br />- <br /> <br />r'I <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />..., <br /> <br />. <br /> <br />r"""I <br /> <br />. <br /> <br />II <br /> <br />. <br /> <br />.., <br /> <br />. <br /> <br />1""'1 <br /> <br />. <br /> <br />Walls which do not meet these tolerances will not be accepted by the Department and <br />must be removed and reconstructed at no cost to the Department. <br />548-6.4.2 Tolerances for Temporary Walls: Ensure that vertical tolerances <br />(plumbness) and horizontal alignment tolerances do not exceed 3 inches [75 mm] when <br />measured with a 10 foot [3.048 m] straight edge. The final overall vertical tolerance of the <br />completed wall (plumbness from top to bottom) shall not exceed 1 inch per 3 feet [13 mm <br />per meter] of wall height, not to exceed a total of 6 inches [150 mm]. Walls which do not <br />meet these tolerances will not be accepted by the Department and must be removed and <br />reconstructed at no cost to the Department. <br />548-6.5 Backfill Placement: Perform work in accordance with an approved Quality <br />Control Plan (QCP) meeting the requirements of 6-8. A LOT is defined as a single lift of <br />finished embankment not to exceed 500 feet [150 m] in length. Isolated compaction <br />operations will be considered as separate LOTs. For multiple phase construction, a LOT will <br />not extend beyond the limits of the phase. <br />Place the backfill closely following the erection of each course of precast <br />components or soil reinforcement layers and spread by moving the machinery parallel to <br />the wall face. Do not allow equipment heavier than 8 tons [7.5 metric tons] closer than <br />3 feet [1 m] behind the wall face. Place backfill in a manner to avoid any damage or <br />disturbance to the wall materials or misalignment of the facing materials. Remove and <br />replace any wall materials which become damaged or disturbed during backfill placement <br />at no cost to the Department, or correct as directed by the Engineer. Remove and <br />reconstruct any misalignment or distortion of the wall facing due to placement of backfill <br />outside the limits of this specification at no cost to the Department. <br />Sheepfoot, grid rollers or other types of equipment employing a foot are not <br />allowed. Achieve compaction within 3 feet [1 m] of the back of the wall face using a <br />power operated roller or plate weighing less than 1,000 Ibs [450 kg]. At a distance greater <br />than 3 feet [1 m] from the back of the wall, a vibratory roller may be used, provided that <br />the frequency and amplitude combined with bulk weight of the roller has performed <br />satisfactorily at a trial section of the same type of wall. A smooth wheel or rubber tire <br />roller is considered adequate. Ensure that the maximum lift thickness after compaction <br />does not exceed 6 inches [150 mm]. Decrease the lift thickness if necessary, to obtain <br />specified density. <br />Perform backfill compaction in a way that the compactor moves in a <br />direction parallel to the wall face and proceeds from a distance not less than 3 feet [1 m] <br />behind the wall face toward the end of the soil reinforcement element. <br />Ensure that the moisture content of the backfill material prior to and during <br />compaction is uniformly distributed throughout each layer of material. Use backfill material <br />having a placement moisture content at the dry side of the Optimum Moisture content. To <br />achieve the required compaction moisture content, use water that meets the requirements <br />of Section 923. Do not use saltwater. Do not transport excessively moist backfill materials <br />to the site for any reason. The Engineer will determine the Optimum Moisture Content in <br />accordance with FM 5-521. <br />At the end of each day's operation, shape the last level of backfill to permit <br />runoff of rainwater away from the wall face or provide a positive means of controlling run <br />off away from the wall such as temporary pipe, etc. <br /> <br />09/09 <br /> <br />01000-126 <br /> <br />03-4122.F <br />
The URL can be used to link to this page
Your browser does not support the video tag.