My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications Vol. II
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(09-09-01) Streetscape Improvements 175th Ter & 183rd St
>
Specifications Vol. II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 11:13:16 AM
Creation date
5/12/2011 11:12:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Closure
Bid No. (xx-xx-xx)
09-09-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,.., <br /> <br />- <br /> <br />..., <br /> <br />.., <br /> <br />548-7 Acceptance Program. <br />548-7.1 General Requirements: Meet the requirements of 120-10.1 except delete <br />the requirement of 120-10.1.4.1, 120-10.1.6 and 120-10.2. <br />548-7.2 Maximum Density Determination: Determine a minImum Quality Control <br />(QC) density of 100% of the maximum density in accordance with FM 1 T-180. <br />548-7.3 Density Testing Requirements: Ensure compliance with the requirements of <br />nuclear density testing in accordance with FM 1- T 238. Determine the in-place moisture <br />content for each density test. Use FM 1-T 238, FM 5-507 (Determination of Moisture <br />Content by Means of a Calcium Carbide Gas Pressure Moisture Tester), or FM 5-535 <br />(Laboratory Determination of Moisture Content of Granular Soils By Use of a Microwave <br />Oven) for moisture determination. <br />Perform these tests at a minimum frequency of one set of tests per lOT. <br />One set of tests is defined as a density test for the fill within 3 ft [1 m] behind the wall <br />face and another density test for the fill beyond 3 feet [1 m] behind the wall face. <br />Determine test locations including stations and offsets, using the random <br />number generator provided by the Engineer. Do not use note pads or work sheets to record <br />data for later transfer to the density log book. Notify the Engineer upon successful <br />completion of QC testing on each LOT. <br />548-7.4 Acceptance Criteria: Obtain a minimum density of 90% of the maximum <br />dry density as determined by FM 1 T -1 80within 3 ft [1 m] behind the wall face and obtain <br />a minimum density of 95 % of the maximum dry density as determined by FM 1 T -180 <br />from beyond 3 feet [1 m] behind the wall face. <br />548-7.5 Frequency: Conduct sampling and testing at a minimum frequency listed in <br />the table below. The Engineer will perform Verification sampling and tests at a minimum <br />frequency listed in the table below. <br /> <br />. <br /> <br />.., <br />. <br /> <br />" <br />. <br /> <br />. <br /> <br />,., <br />. <br /> <br />., <br />. <br /> <br />f"1 <br />. <br /> <br />.., <br />. <br /> <br />., <br />. <br /> <br />r, <br /> <br />Test Name Quality Control Verification <br />Maximum Density One per soil type One per soil type <br />Density One set of tests per LOT per One set of tests per four LOTs for each <br />Section. ~ype of QC test. <br /> <br />"'1 <br /> <br />. <br /> <br />. <br /> <br />r , <br /> <br />548-8 Certification. <br />Furnish a copy of all test reports which are necessary to document compliance with <br />the Specifications, at least ten days prior to wall construction. <br />Also furnish the Engineer a Certificate of Compliance certifying that the retaining <br />wall materials, backfill and construction practices comply with this Specification. <br />Acceptance of furnished material will be based on the Certificate of Compliance, <br />accompanying test reports, and visual inspection by the Engineer. <br /> <br />. <br /> <br />,..., <br /> <br />. <br /> <br />., <br />. <br /> <br />548-9 Method of Measurement. <br />The quantity to be paid for will be the plan quantity, in square feet [square meters], <br />completed and accepted, of the area bounded by the top of the coping, the top of the <br />leveling pad, top of structural footings, bottom of walls which do not have footings or <br />leveling pads, and the beginning and end wall limits as shown on the wall control <br />drawings. <br /> <br />,.., <br /> <br />. <br /> <br />,.., <br /> <br />. <br /> <br />...., <br /> <br />. <br /> <br />r-I <br /> <br />09/09 <br /> <br />01000-127 <br /> <br />03-4122.F <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.