My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 09-06-01 Removal, Fabrication, Installation of St. Signage
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2011 2:36:58 PM
Creation date
5/12/2011 2:36:51 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Removal, fabrication & installation of St. Signage
Bid No. (xx-xx-xx)
09-06-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />\l <br />:t <br />fl <br />() <br /><I) <br />:l <br />fl <br />~l <br />,. <br />'l <br />~. <br />1 <br />~ <br />,,) <br />~t <br />~ <br />') <br />:l <br />') <br />~) <br />~) <br />) <br />~l <br />~. <br />~) <br />... <br />.l <br />") <br />,. <br />) <br />;) <br />"') <br />l <br />:) <br />') <br />,~ <br /><I) <br />~) <br />~l <br />. <br />) <br />t <br />) <br />""\ <br /> <br />burial? <br />Give us a unit price for a standard sign, and an additional (add on) unit price fo,. <br />having to place it in concrete. <br /> <br />8. On the evaluation of the bid, will you be evaluating on unit price or lump sum total? <br />Unit pl"ice, but it doesn't matter, it is the unit price times the number of signs. <br /> <br />9. Around the school area, do we bid on the signal devices signs, such as "School Zone"? <br />Leave those out. <br /> <br />10. Is a Bid Bond or Performance Bond required? <br />We have liability insurance required from the company. Assistant City Manager Vera <br />will speak with the Legal Department. There is not one currently required but there <br />may be an addendum added to include it. <br /> <br />11. Wouldn't it be easier if you listed the signs and then they put a number next to it? <br />We could do that but with your expertise of what we are looking for, we don't know <br />necessarily which signs require what. <br /> <br />12. Do we include the signs at entrances/exits onto commercial properties? <br />No, not private signs. Only those in the right-of-way. <br /> <br />13. Do we include Evacuation Signs? <br />\Ve aren't aware that we have any, but include any existing signs. <br /> <br />14. Does the price include removal of existing signs? <br />Yes, the price includes the removal of the existing sign. <br /> <br />15. Do you want the old signs, and if you do, where should we deliver them? <br />Yes, deliver them under the William Lehman Causeway bridge. <br /> <br />16. For the criteria under No.7 (page 3), back of signs to have stickers with proposer's name, is <br />this FDOT styles? <br />Yes. <br /> <br />17. What is the timeframe? <br />The Central Island Project is coming to an end, and so we would like to start putting <br />these signs up by the end of July or the beginning of August, and we need them up <br />ASAP. You can propose a time in your proposal and that will be taken into account as <br />well. <br /> <br />18. Do we have to provide shop drawings? <br />Yes. <br /> <br />19. Will the decision be made solely on price or will you evaluate other factors? <br />We will evaluate other factors as well. This City tends to focus on quality, we want a <br />good price, but we don't want to pay any more than we have to. This isn't about <br /> <br />Mandatory Pre-Submittal Conference QA 070609 <br /> <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.