My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pios & Sons
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 09-11-01 Prof. Design & build svcs. for skateboard park
>
Responses
>
Pios & Sons
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 3:53:42 PM
Creation date
5/13/2011 3:52:43 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design & build svcs for skateboard park
Bid No. (xx-xx-xx)
09-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'l <br />C) <br />') <br />'} <br />,") <br />"l <br />~ <br />() <br />f) <br />() <br />:l <br /><t <br />a <br />(t <br />() <br />3 <br />. <br />. <br /> <br />Yes. <br /> <br />5. Regarding the sidewalk that is going around it, he worked with some designs in the City a <br />couple of years ago on this project, and he recalls when you are standing inside the grass <br />area and you look over the sidewalk, it is a few feet higher than the grass area, and so he <br />thinks the ideas they were talking about was to cut that berm down for drainage because <br />there is a drain in this area that is way down but they didn't think they could get everything <br />over there and it would cause drainage issues. <br />The berm area is on the outside ofthe Skateboard Park. The inside from the sidewalk <br />in, is really pretty flat. There is a drain there but there is no actual berm. <br /> <br />6. He understands that the sidewalk is at least a couple of feet higher, and so water would <br />actually drain back in. Did it change? <br />Not any more, maybe the sidewalk settled. <br /> <br />7. There is only a drain way down here, and so they said if we made this all concrete it would <br />become a big bathtub because water wouldn't have a place to run off from. <br />You would need to include drainage in your design. <br /> <br />-. <br />., <br />,..... <br />.. <br /> <br />. <br /> <br />8. The exercise stations that are included in the RFP as well to be removed and reinstalled at <br />another place in the Park, is that correct? <br />Yes, we don't want them there. <br /> <br />,.... <br />., <br />,l <br />~ <br />~ <br />') <br />') <br />') <br />, <br />~ <br />'t <br />:l <br />~ <br />~ <br />'} <br />~ <br />,.) <br /> <br />, <br />..lIP <br /> <br />9. The existing sketch of the stations, there are three elements inside the Skateboard Park, are <br />you planning to maintain them there or relocate them? <br />The exercise stations in that area are coming out. We may relocate them within the <br />Park. <br /> <br />10. That would be part of your expense, not ours? <br />The Contractor will take them out, and at that time we will decide if we will keep them <br />in the Park or put them in storage. <br /> <br />11. What would be the directives that you give us, to keep them in the proposals? <br />The Contractor will take them out. Design the Skateboard Park just for a Skateboard <br />Park. <br /> <br />12. Is there a designated staging area where they can stage their equipment because there is very <br />little parking area, and also getting concrete trucks, pumps into that area. Is it considered to <br />be the north entrance, and we can temporarily fence that area in. The concrete trucks will <br />break up those sidewalks. <br />We could give you that corner as shown on the diagram, Come in the north end where <br />you are planning to do a ncw entrance anyway. <br /> <br />" <br />. <br />:J <br /> <br />13. Is it possible that we can temporarily fence our equipment in? <br />Yes. You can use that area for storage of equipment and for staging. As far as running <br />across the existing concrete pathway, if you break it, you fix it. Also make sure you are <br />aware that there are electrical panels right in thc middle of the north end ofthe Park. <br />14. The sidewalk from north to south is maybe 8-inches higher so that there is some tapering in <br /> <br />:t <br /> <br />~, <br />.. <br />. <br />-.... <br />. <br /> <br />Mandatory Pre-Submittal Conference QA 111809 <br /> <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.