Laserfiche WebLink
<br />'I <br />() <br />~ <br />:l <br />~ <br />:a <br />o <br />() <br />f) <br />(. <br />el <br />() <br />~. <br /><t <br />~ <br />. <br />~ <br />. <br />~ <br />() <br />. <br />. <br />., <br />. <br />~ <br />~ <br />f) <br />() <br />() <br />~ <br />. <br />() <br />~ <br />() <br />~ <br />~ <br />.. <br />" <br />- <br />...... <br />, <br /> <br />:l <br />. <br />~ <br /> <br />the center of that grass area although very subtle, whether or not we can drain from north to <br />south. <br />Yes, you would have to design the drainage for it. That wou Id probably be the best way <br />to do it. <br /> <br />15. Within the parameters of the design, or the intention of the City to provide the skateboard, in <br />all the circumstances that go on around that activity, it requires most probably the <br />implementation of a first aid station, have you considered that? <br />We would like to see in the area where you are coming from the Park into the <br />skateboard area, a kiosk type of place because it would be controlled access. They <br />would have to sign a waiver, maybe pay a fee, we haven't decided yet how that part of it <br />is going to work, but we do need some type of kiosk there, <br /> <br />16. What about the rest like drinking fountains, emergency pullouts, things like this? <br />We would suggest that you put that in your design. <br /> <br />17. In the RFP documents, there wasn't anything for sealed drawings required by the winning <br />contractor or anything about geotechnical work. Is that going to be required? <br />That would be required, what we are choosing here is the team, and from there on, <br />once we pick the team, we will go forward with the working drawings. <br /> <br />18. Okay, but you will need them sealed by Florida? <br />Yes. (see answer in question 19) <br /> <br />19. The budget for $250,000.00, he has worked on some projects where the assumption is to <br />show us what you can do for $250,000.00, and then they award it to someone else who are <br />"low bid", and so it is not a low bid situation, just show us what you can do for $250,000.00, <br />is that correct? <br />City Manager Rick Conner said what we are asking you to do is to come to us, at this <br />point not with sealed drawings, we are asking you to come to us with a concept that <br />shows how you would address the requests that we have made. This is your chance to <br />show a little creativity and give us a nice product within the parameters that we have <br />asked for. In addition to that, it would be very wise if you could give us a break down <br />of the expected range of costs, we are not saying quotes, we are not asking for dollar <br />amounts specifically, the range of quotes that would accompany the different aspects of <br />the project. We can then look at each of your submissions, and say these people were <br />creative, they gave us exactly what we were looking for in a very unique and positive <br />way, and the comparative prices are in the ballpark. At that point we start to limit the <br />field, make choices, figure out who did those things well, and then we start sitting down <br />and talking about specifics, we will short list and get with you and work through that <br />process. Right now we are looking for your best proposal to show us how you would <br />accomplish the goal, creatively, and approximately what the values would be. That is <br />the first step. <br /> <br />20. The fence that borders the site with the condominium, would there be any chance of <br />removing and replacing that fence during the construction to bring in the equipment and to <br /> <br />-.. <br />. , <br />~ <br /> <br />Mandatory Pre-Submittal Conference QA 111809 <br /> <br />Page 3 of 5 <br /> <br />......... <br />