Laserfiche WebLink
<br />h. <br /> <br />Environmental Permittinq <br /> <br />305-477-7575 <br /> <br />EAS Edward A. Swakon, P.E. <br />EAS Engineering, Inc. <br />55 Almeria Ave. <br />Coral Gables, FL33134 <br />305-445-5553 x305 <br />305-444-2112 - Fax <br /> <br />2. North Bav Road BridCle. This project has been designed substantially and is being <br />submitted to DERM and other agencies for comments and dry-run approvals. Below are <br />the firms that provided or are currently providing assistance to the City of Sunny Isles <br />Beach: <br /> <br />a. <br /> <br />STATUS: <br /> <br />b. <br /> <br />Contractor of Record: <br /> <br />c. <br /> <br />Structural Desiqner: <br /> <br />d. MEP&F: <br />e. Civil of Record: <br />f. Permittinq <br /> Proiect Administrator: <br />g. Terminated <br /> Prime Consultant <br />h. Environmental Permittinq <br /> <br />Project has not been advertised. Drawings <br />have been substantially completed. State <br />and Federal Permits are not anticipated until <br />June 2012 or later. Hurdles include: DERM, <br />Corps, FDEP, FWS, and other agency review <br />and approval. In addition, approval of <br />mitigation of mangrove impacts and a <br />determination by DERM and other agencies <br />having jurisdiction. <br />TBD <br /> <br />BHA (Aztec) Engineering <br />510 Shotgun Road Suite 400 <br />Sunrise, FL 33326 <br />Tel: 954.334.2752 <br /> <br />N/A <br /> <br />Pending under this RFQ <br /> <br />Calvin Giordano and Associates <br />1800 Eller Drive, Suite 600 <br />Ft. Lauderdale, Florida 33316 <br />Tel: 954-921-7781 <br /> <br />Marlin Engineering, Inc. <br />305-477-7575 <br />EAS Edward A. Swakon, P.E. <br />EAS Engineering, Inc. <br />55 Almeria Ave. <br />Coral Gables, FL33134 <br />305-445-5553 x305 <br />305-444-2112 - Fax <br /> <br />3.2 CONSTRUCTION ADMINISTRATION AND PROJECT MANAGEMENT SERVICES: <br /> <br />Services during Construction shall include standard construction management / <br />administration services and support to City and its Project Manager (PM) in managing the <br />construction contract in accordance with the requirements of the Project Manual and/or <br />Contract Documents. <br /> <br />Support Responsibilities: Manage and Assist the City Project Manager in all activities <br />related to the construction contract and the administration of the same. Perform tasks <br /> <br />PAGE 22 OF 34 <br />BID No. 11-07-01 <br />