Laserfiche WebLink
<br />coordinated. <br /> <br />29. Can you just go ahead and set up the day? <br />Yes, ifthat is what you all want (all agreedj, okay so an Addendum will be prepared for <br />a specific date fOl' the 350 property. <br /> <br />I have to c1adty that you have to request all the permits. When it comes to the City <br />permit, the City does requil'e that all properties be enclosed and that it has pollution <br />protection on the fencing. So make sure you incorporate that. The only fee that is <br />going to be waived is any fees that are from the City. Ifthel'e is a Miami-Dade County <br />fee, which there typically is, I think it is 60 cents on ever $1 ,000, that is still required to <br />be paid by the contractor. And so when you go pull a permit with the City there are <br />still some charges that might be there. The only fees that we waive are our own City <br />fees. The contractor will be required to pull all permits under his name, ~lIld to supply <br />all the necessal)' documentation for that permit. <br /> <br />30. Are you talking about the construction fence, the temporary fence? <br />All construction fencing shall have dust control. <br /> <br />31. The silt fence? <br />The silt fence will be required if and when, in W ASD you have got the mangroves in the <br />back, yes the silt fences are part of the NPDES requirements, which means that no <br />pollutant can le~lVe the particular demolition site and go into the right-of-way, <br />everything has to be controlled on site. Contractor is responsible for all permit <br />I'equirements and conditions. <br /> <br />32. I believe that Sunny Isles Boulevard and all the surrounding streets are higher than the grade <br />of the parking lot, and so it wouldn't make any sense to put a fence around it plus the cost for <br />trenching through asphalt for fencing would be astronomical, it just doesn't make sense and <br />he would ask that that requirement be waived? <br />We can't waive the NPDES requirements, and so when you pull the permit and the <br />NPDES issue does come up then it will be a requil'ement, if it doesn't, then it is not. I <br />can tell you based on my knowledge that all the pollutants must be controlled on site. <br /> <br />33. In the event that there is asbestos in the building, tie it in with any cost for abatement? <br />Whatever the asbestos report comes in and says abatement, will be time and material. <br />All you will be including on YOUI" pl"ice is demolition as you regularly demolish, and the <br />asbestos report. When the recommendation comes in from the asbestos company if <br />they do find asbestos in it, then we have to develop a plan that is going to he amicable <br />for all to remove it. Any abatement shall he hased on asbestos I"eport and shall he paid <br />fOl' on a time and material basis upon review by the City. <br /> <br />34. Is the City going to cap the water and the sewer or is that our responsibility? <br />No. This is the Contractol"s I'esponsibility. When you pull the permit with the City of <br />Sunny Isles Beach, you will have to have the notices all clear from all 1'ECO, CNMB <br />(City of North Miami Beach) fOl' the utilities, FPL and AT&T, and you are responsible <br />fOI' that. <br /> <br />11-07-03 Pre-Submittal Conference QA 072011.doc <br /> <br />Page 5 of 6 <br />