My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ocean Bldg. Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-07-03 Demolition Services for Multiple City Properties
>
Responses
>
Ocean Bldg. Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2011 10:09:15 AM
Creation date
8/23/2011 10:08:55 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Demolition Svcs
Bid No. (xx-xx-xx)
11-07-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />~ <br />~~~ <br />~~I~N'~ <br />~.~~~.} <br />(~f~~~~::-.; <br />"'22~~~~ <br />~~~~~ .~ <br />~:~~~~~~ . <br /> <br /> <br />/--- <br />()(~I~l'N <br /> <br />IIIJ I L J) I N 4, fi U 0 IJ P <br /> <br />METHODOLOGY <br /> <br />The following soft stripping is the safest demolition method for structures of this size and construction is remote demo- <br />lition using specialist demolition excavators with attachments such as pulverizes, rotational grapples and buckets to <br />demolish the structure handle and process arising's for removal off site. This method minimizes the amount of the <br />work undertaken (externally) by demolition operatives. <br /> <br />GENERAL <br /> <br />Careful programming of all elements i.e. soft stripping and demolition is to be adopted with areas being <br />handed over as they are cleared for the next operation. Sectional completion of elements / areas will <br />enable the works to progress in the manner as described below; <br /> <br />SITE ESTABLISHMENT <br /> <br />An induction and toolbox talk will be given by the site manager identifying specific items relevant to the <br />upcoming works program. After completion operatives will then put on suitable PPE and transfer all <br />necessary equipment to the working area. Permits to work will be requested / issued prior to any <br />works commencing. <br /> <br />TRAFFIC MANAGEMENT <br /> <br />The suggested approach for sites of this nature is to establish as early as possible a one way system of <br />moving skip vehicles. <br /> <br />PERIMETER PROTECTION <br /> <br />The site perimeter is to be protected with a mix of timber or chain link fencing. Solid panels on tempo- <br />rary blocks will be used in sensitive areas where hoarding erections take place and may also form <br />the perimeter barrier where site conditions / logistics will be changing directly following demolition <br />works of short duration works are being carried out. <br /> <br />SKIRTING BOARDS AND DOOR FRAMES <br /> <br />Skirting boards and door frames are to be removed by site operatives using pinch bars and suitable <br />hammers. The items are to be prized from their place of fixing. Any obstruction and nails are to be <br />removed with all resultant materials then being transported utilizing the wheelbarrows and carrying <br />by hand to the designated drop / loading zones. <br /> <br />FLOOR COVERINGS <br /> <br />The carpet coverings are to be removed by the operatives using mattock picks and shovels. Where the <br />carpets are of a roll able nature these are to be cut into strips, whilst still laid, and then rolled up for <br />collection. <br /> <br />Prnfp~~inn~1 npmnlitinn C;prvirp~ Fnr Mllltinlp Citv Prnnprtip~ I RpnllP~t fnr Prnnn~~1 Nn. 11-07-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.