Laserfiche WebLink
<br />. <br /> <br />13. Why do you want a boundary survey? <br />The boundary survey is not requircd. What is required is a topographic survey with a <br />tree disposition plan included. <br /> <br />. <br /> <br />14. Are there trees on the properties? <br />Ycs. Field verify and include in the surveys as per agencics having jurisdiction. <br /> <br />. <br /> <br />15. Are all the trees going? <br />Yes. Include in proposal per DERl\1 requirements. OERM permit re<)uired. All the <br />trees are going to the extent that it, in other words I will tell you how I did it on this <br />other property and this is the flexibility that we have. DERM will say that we have to <br />leave the tree, I am going to leave it. If I have to replace a tree, then it is time and <br />material for you all to get me replacement trees that I am going to put throughout the <br />City. That is how we are going to have to deal with that, and so it is going to be, if, and <br />you don't know right now what DERM's requirements are going to be for tree <br />removal. so it will be time and material. <br /> <br />. <br /> <br />. <br /> <br />16. And you don't know what the extent of asbestos is? <br />1\0. Vendor is to produce the necessary asbestos report with an abatement plan as <br />necessary. The City docs not know the extent of the asbestos on these buildings. That <br />too is going to be time and material when and in the event that we get to that point. <br />There is no other way to try to figure that one into the equation. <br /> <br />I <br /> <br />17. And so we need to get an asbestos survey? <br />Yes. figu re on getting an asbcstos report with rccommendations for every property in <br />accordance to State requirements. <br /> <br />I <br /> <br />18. That is part of your RFP? <br />That is part of the RFP that the proposer is going to be submitting to me. In essence <br />what I want to see is, I want to give you an 1\TP and when I get a call from you. all <br />permits are done, the site is leveled to lime-rock or to grade. <br /> <br />19. What about pilings? <br />Pilings will be time and material because we don't know the extent of the pilings. <br /> <br />. <br /> <br />20. Right, but typical foundations and footings you want out but pilings and tier caps remain? <br />Yes, just take it to grade. <br /> <br />. <br /> <br />21. Are you going to require a lead survey? <br />Per DERM. ) am going to re<luire whatever DERM requires. A lead survey. they <br />didn't ask for it the last time) did this, they only asked for an asbestos survey. <br /> <br />. <br /> <br />You do want to take into consideration that a couple of our properties have dr~ <br />cleaners. Even though DERM does not have a problem. there is no special issues <br />relatcd to dry clcaners except when they remove their equipment. it has to be removed <br />according to their regulations. That is something that you are not going to be <br />responsible for but in the cvent onc ofthc dry cleaners leave a space with material that <br />OERM does not look on favorably. that will be time and material as well. So the <br /> <br />I <br /> <br />11-07-03 Pre-Submittal Conference Q1\ 072011.doc <br /> <br />Page 3 of 6 <br />