My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach: Special Inspection Services <br />RFO No. 11-07-11 <br /> <br />c <br /> <br />As standard protocol. which occurs at the completion of construction, URS certifies to FOOT that the projects <br />have been completed in substantial conformance with the plans and specifications. <br /> <br />In summary, through URS' successful design and construction CEI experience on some of the most notable <br />and challenging bridge projects in Florida, URS has demonstrated that our design and CEI staff have a <br />complete and full understanding of the acceptable methods of bridge design and construction <br />methodologies that need to be applied to design and successfully complete any given project. The <br />URS team detailed in this RFP is geared to provide the City with key personnel who have direct experience <br />on many of these challenging bridge projects and who will bring to the City a wealth of experience in <br />foundation and bridge construction. Additionally, proposed team members have extensive experience with <br />geotechnical conditions in the Sunny Isles Beach area as well as with the design and construction <br />considerations involved with deep foundation systems (i.e. driven piles, ACIP pies and drilled shafts). <br /> <br />2.4 REPRESENTATIVE CONSTRUCTION ADMINISTRATION AND PROJECT MANAGEMENT <br />SERVICES <br /> <br />URS has also grown to become one of Florida's top providers of construction program management <br />and construction engineering and design services. Over the years, we have developed an expertise in <br />federally and publicly funded projects, where we have worked with clients to successfully complete some of <br />the most significant projects in Florida's history. Our recent work program management work includes many <br />high-profile projects such as the SR 704 Bridge of Lions, Adrienne Arsht Center for the Performing Arts of <br />Miami-Dade County and the Palm Beach Convention Center in West Palm Beach. <br /> <br />c <br /> <br />It is anticipated that construction administration and project management services will include, but not be <br />limited, to the following: <br /> <br />. Precast yard - pre-stressed pile fabrication inspections <br />. Pile/Pier foundation load testing and installation inspection and documentation <br />. Pier deck construction inspection <br />. Restaurant Facility construction inspection <br />. Construction Material Sampling and Testing <br />. Special Inspector Inspections <br />. Underground utility installations and connections <br />. Pavement milling and resurfacing of roadways <br />. Roadway / Bridge abutment soil compaction inspection and testing <br />. Oversight management and review of Submittal and RFls and status of resolution <br />. Review and recommendations regarding any non-compliance notifications <br />. Change Order review and independent cost analysis and evaluations of proposed changes <br />. Review of Contractor's construction progress, schedule and critical path compliance <br />. Oversight of Contractor's performance regarding safety <br />. Review and recommendation to pay Contractor's application for payment <br />. On-site observations and reports on Contractor's construction progress <br />. Individual project budget and schedule review and monitoring <br /> <br />r <br />~ <br /> <br />241[;-~- <br />- . d 6 'C <br /> <br />URS <br />
The URL can be used to link to this page
Your browser does not support the video tag.