My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
URS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 11:39:17 AM
Creation date
8/30/2011 11:38:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Services including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach: Special Inspection Services <br />RFONo.11-07-11 <br /> <br />C CM/Design Proiect #6 - SFWMD Stormwater Treatment Area 2 <br /> <br />The design and construction of ST A -6 Section 2 Flow-way 3 will help to provide significant improvement in <br />the ability to treat storm water flows from the 170,000 Acre C-139 Basin and the C-139 Basin Annex in <br />Hendry County, Florida. The proposed ST A-6 Section 2 Flow-way is located just North of constructed and <br />operational ST A-6 Flow-way Cells 3 and 5. ST A-6 Section 2 Flow-way provided for the additional <br />construction of 1 ,440 acres of new () . <br />impoundments in a 1.5 mile by 1.5 mile square <br />impoundment/treatment area. <br /> <br /> <br />As part of the design development process, <br />detailed Hydraulic Modeling and Geotechnical <br />Engineering of the proposed expansion was <br />completed in late 2005. Detailed Civil, <br />Structural, Mechanical and Electrical Designs i. <br />were completed in September, 2005 and the <br />project construction was completed in July <br />2007. Full time CM and testing services <br />were provided by URS staff during the 1.5 <br />year construction duration. <br /> <br />. <br /> <br />r <br />'--" <br /> <br />c <br /> <br />Certificate of <br /> <br />Appreciation <br />t: ~. <br />...."'- <br /> <br />r"\ <br />, ... <br />\. <br /> <br />rw.............~.. <br />U"~""""OftIC. <br />""'--,...-- ....... ..... :I , <br />,--'__At.-.s...-l ~ <br />"-'- <br /> <br />J ~ <br />I ~ <br /> <br />"." <br />~. <br />{'oI ' <br />\~~, <br />~ ........~ <br /> <br />....................~.. <br />s..-......._.......-........ <br />.......-- <br /> <br />~ , <br />~ 11/1~l>5" <br /> <br />-,_....._- <br />.....-- <br />-.-- <br /> <br />__ LQD~ma~ <br /> <br />~ <br />i ...... <br />-.. ...-......-- <br />-. - <br />----- <br /> <br />..1,./s.os <br />i.O,.--- <br /> <br />~c>>_ <br /> <br /><J <br /> <br />Owner: South Florida Water Management <br />District <br /> <br />URS Role: - Full Service Engineering Design <br /> <br />- Construction Project Management <br />and Administration <br /> <br />Project Type: Water Ouality Treatment <br /> <br />Total Construction Value: $23.5 Million <br /> <br />Project Start: 2005 <br /> <br />Completion: 2007 <br /> <br />2 11 I co - ~ .- <br />- I C. E C <br /> <br />URS <br />
The URL can be used to link to this page
Your browser does not support the video tag.