My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tally Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-07-01) Special Inspection Svcs, including Geotechnical/Const. Admin.
>
Responses
>
Tally Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 2:27:13 PM
Creation date
8/30/2011 2:26:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Special Inspection Svcs including Geotechnical
Bid No. (xx-xx-xx)
11-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />...... <br />. <br />.., <br />. <br />.., <br />I <br />.., <br />. <br />-, <br />I <br />.., <br />. <br />-, <br />. <br />., <br />. <br />., <br />. <br />. <br />.., <br />. <br />-, <br />. <br />.., <br />. <br />, <br />I <br />-, <br />. <br />.., <br />. <br />..., <br />. <br />., <br />. <br />.., <br />. <br />.., <br />. <br /> <br />REQUEST FOR QUALlFIL\TIO:\"S <br />i'l0. 11-07-01 <br />Spccial I nspcction Serviccs <br />Including Gcotechnical / <br />Construction Administration <br /> <br />~ <br />TAllY F:;'>;{;TNFERIi'lG INC <br />t:n;:iDI.'Crin~" ~l11h:rial~ Tc..tiQ.~ "(;l'ukchninl.1.<Ihllrlllllr) <br /> <br />---------- <br /> <br />. Masonry <br />. Grout and Mortar <br />. Epoxy & Expansion Anchors <br />. Expansion Bolt Pull Testing <br />. Footing Excavation <br />. Pile/Pier Installation <br />. Reinforcement Placement <br />. Concrete Placement <br />. Site Grading Observations <br />. Soil and Paving Compaction Testing <br />. Marshall D1559 for Asphalt <br />. D1557 for Base Material <br />. Welding Including any NDT Requirements <br />. Field Welding <br />. High Strength Bolting <br />. Masonry Placement & Grouting <br />. Shear Stud Installation <br />. Epoxy & Expansion Anchors <br />. Anchor Bolts Embedded in Concrete or Masonry <br /> <br /> <br />A Schedule of proposed services. The schedule should include the Proposer's <br />understanding of the issues and tasks of the project at hand. <br /> <br />For the actual schedule of these activities, please see attached. The following lists the major items <br />of work for each project. <br /> <br />Fishinq Pier <br />Precast the piles at the precast yard <br />Precast Double 'T at the precast yard <br />Pile driving for pier <br />Perform vibration monitoring <br />Cast pier caps <br />Install Double 'T System <br />Install Railing <br />Apply class V finish <br />Every activity requires material testing and inspection <br /> <br />Restaurant <br />Perform all the required inspections as a Specialty Inspector for all the building elements as <br />specified by all the building codes. <br /> <br />Bridqe <br />Precast AASHTO beams at precast yard <br />Perform rock coring prior to drill shaft installation by the specification <br />Perform drill shaft installation <br />Perform CSL testing on every shaft within 7-25 days <br />Cast pier caps <br />Install precast beams <br />Pour diaphragm <br />Place stay-in-place forms <br />Install reinforcing rebar <br />Pour bridge deck <br />Pour handrail and walkway <br /> <br />P~OP r. of 1., <br />
The URL can be used to link to this page
Your browser does not support the video tag.