Laserfiche WebLink
<br />. <br />~ <br />:t <br />:J <br />. <br />~ <br /> <br />'"' <br />..I' <br /> <br />. <br />:l <br />~ <br />.. <br />. <br /> <br />~ <br />...,. <br /> <br />:t <br />~ <br />"'"'\ <br />".. <br />~ <br /><t <br />~ <br />'l <br />') <br />:t <br />:l <br /> <br />....... <br />. <br />\) <br />.... <br />() <br /><l <br /><l <br />{) <br />() <br />() <br />() <br />'l <br />~ <br />f) <br />() <br />o <br />. <br />() <br /><) <br />(t <br />() <br />() <br /> <br />- <br /> <br />f@.;;\.'}caIVin.GiOrdanO&ASSociates.lnc. <br />~IExcErT'oNAI SOLllTIONS <br /> <br />I <br /> <br />c. CGA has a clear understanding of the entities and processes which are required for <br />environmentally sensitive permitting. Our experience with these processes has been <br />demonstrated throughout the pier permitting process along with our other recently <br />permitted coastal projects. <br /> <br />2. Coordination of Contractor's submittals-CGA has completed this task on numerous previous <br />projects. We will utilize our standard forms for tracking the submittal process. CGA can organize <br />all of the submittal and other project files and upon completion of the project submit a final, <br />properly organized binder of approved submittals. <br /> <br />3. Site Observations/Close-out- CGA's staff has performed quality control and assurance <br />observations on many large projects including the 595 Express Lane and the 1-75 Interchange. We <br />have completed many projects in which we have utilized subcontractors to perform inspections and <br />testing. In each of these cases we have successfully read, interpreted and reacted to these testing <br />and inspection reports. CGA is also familiar with vibration monitoring. Our staff has utilized this <br />monitoring during blasting, beach construction and pier test pile installation. <br /> <br />4. On-site Presence-In many municipal applications, a part time on-site presence is required. CGA <br />has worked with many municipalities to acquire the perfect balance between budget and on-site <br />presence. We will work with the City to ensure that we stay within budget while still providing <br />adequate on-site presence. <br /> <br />S. Safety-Each of CGA's field employee has participated in al0-hour OSHA Course. This course is <br />designed to help identify potential safety hazards on construction sites. <br /> <br />6. Schedule & Budget-CGA's staff is experienced in construction scheduling and budgets. CGA can <br />create Primavera schedules, S Curves and Cash Flow graphs. Each of these reporting tools is to help <br />identify schedule and budget concerns early on so they can be addressed prior to becoming critical <br />path items. <br /> <br />PROFESSIONAL CONSULTING SERVICES <br /> <br />Prime Consultant <br />Over the course of several decades and dozens of projects CGA has excelled at assuming the leadership role <br />of directing the efforts of the assembled team of sub consultants required of projects with similar or greater <br />scope. CGA staff is experienced and comfortable with taking the lead role and responsibilities required to <br />command the quality of work and schedule demands these projects will require. <br /> <br />Specifically, CGA's resume of successfully completed work includes transportation, roadway, bridge, <br />building construction and marine projects that demonstrate the flexibility and diversity of the many <br />professional disciplines under the CGA mantle. CGA is uniquely adept at combining the outside professional <br />resources with the CGA staff needed to assemble the team to manage these two projects. <br /> <br />A clear distinction CGA brings to the table is the history of involvement with both the Pier and Bridge <br />projects. Not only from leading the permitting efforts but also working closely with the Architects, <br />Engineers and other professionals already in place. CGA has previously demonstrated a depth of knowledge <br />and understanding of the acceptable methods of construction to be implemented i.e. test pile driving & <br />monitoring; pile driving, jetting and limitations; precast tees; poured in place concrete bents; drilled shafts; <br />reinforced masonry, etc. CGA has an unmatched familiarity of the plans, specs, existing utilities as well as <br />knowledge of all work contracted and completed to date. <br /> <br />RFQ #11-07-01, Special Inspection Services, Including Geotechnical/Construction Administration <br /> <br />Page 213 <br />