My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
InterFleet Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-12-01 Fleet Wide Remote Mgmt. System
>
Responses
>
InterFleet Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 10:38:39 PM
Creation date
1/10/2012 11:43:05 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Fleet Wide Remote
Bid No. (xx-xx-xx)
11-12-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
© InterFleet° RFP No. 11 -12 -01 <br />City of Sunny Isles Beach <br />4. Approach / Methodology <br />Implementation Plan <br />The City of Sunny Isles Beach is requesting a GPS /AVL System. Outlined below is a preliminary <br />implementation plan for an ASP solution hosted by InterFleet Inc, providing everything from <br />hardware design, production, firmware development, and software development to system set -up, <br />hardware installations, training, and post deployment support. <br />The Pre - Implementation Study <br />The purpose of this study is to understand in detail the requirements as defined in the proposal <br />and confirm how these are met with the features and functions of Interfleete. Any required <br />configurations of the hardware /software will be defined during this stage. <br />During the Pre - Implementation study, the Client will also be introduced to the opportunities that <br />are available in addition to the pre- defined requirements. A report confirming the overall <br />implementation plan will be prepared. <br />The Pre - Implementation study will be conducted in a joint meeting. A plan for the implementation <br />of InterFleet® hardware will be provided for sign -off before the commencement of the <br />customization and implementation of the project. <br />During this stage, InterFleet Inc. will prepare and deliver the InterFleet® solution. This stage would <br />include the following activities: <br />✓ Project Management. <br />✓ System Set -Up <br />✓ Service Configuration. <br />✓ Hardware Assembly <br />✓ Pre - Delivery Testing <br />✓ Hardware Installations <br />✓ User Training <br />In more detail, the Product Delivery will include the following project activities: <br />The Product Delivery <br />Stage <br />Description <br />✓ <br />Product and Interface Specification and Design <br />Set Up and Configuration <br />✓ <br />System Set Up <br />✓ <br />Service Configuration <br />Hardware Assembly <br />✓ <br />Construction and Assembly of Hardware <br />✓ <br />Third-Party Hardware Acquired <br />System Testing <br />✓ <br />Testing Configured Solution in InterFleet Inc. <br />Development Centre <br />Hardware Installations <br />✓ <br />Installation of Hardware on all Vehicles <br />✓ <br />Testing of Hardware on all Vehicles <br />Documentation &Training <br />✓ <br />Build User Manuals <br />✓ <br />Execute Training Programs <br />✓ <br />Final Testing by Client <br />Acceptance Testing <br />✓ <br />Acceptance of the Solution and Sign Off <br />Go -Live Support <br />Go -Live Support <br />is documen contains information that is proprietary to InterFleet Inc. se <br />or disclosure of any material contained herein without the consent of InterFleet Inc. is strictly prohibited. <br />
The URL can be used to link to this page
Your browser does not support the video tag.