My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 5:25:31 AM
Creation date
1/11/2012 4:19:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering Services
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C I T Y OF S U N N Y I S L E S B E A C <br />T R A F F I C E N G I N E E R I N G S E R V 1 C E S <br />NW 44TH STREET <br />CITY OF LAUDERDALE LAKES, FL <br />The scope of project consisted of the design of NW 44th Street Roadway Improvements from East of State <br />Road 7 to the City limits within the City of Lauderdale Lakes. The project, which was approximately 0.32 <br />miles long, involved the design of the undeveloped section of NW 44th Street into a 4 -lane roadway; <br />connecting to the existing 4 -lane roadway in the City of Oakland Park. The services included roadway plans, <br />design of 72" culvert, signing and marking plans and concrete block privacy walls. The project was <br />nominated for a civil engineering award by the Florida Chapter of the Institute of Professional Engineers of <br />Puerto Rico for its use of Context Sensitive Design Principles and received Third Place. <br />CLIENT <br />City of Lauderdale Lakes <br />4300 NW 36th Street <br />Lauderdale Lakes, FL 33319 <br />Mrs. Sonia Torres, PE, LEED AP <br />City Engineer I Public Works and Engineering Services <br />Tel: (954) 535- 2712/Fax: (954) 731 -5309 <br />storres @lauderdalelakes.org <br />RJ BEHAR'S ROLE <br />Design, roadway plans, signing and marking plans, <br />privacy walls, traffic projections and warrant analysis <br />PROJECT STARTED: 2004 <br />PROJECT COMPLETED: 2007 <br />VALUE OF DESIGN SERVICES: $282,767.00 <br />CONSTRUCTION COST: $1,922,215 <br />RJ BEHAR's KEY PERSONNEL <br />Robert J. Behar, PE - Principal in Charge <br />Carlos Mazorra, PE - Project Manager <br />Juan H. Vazquez, PE, PH, BCEE - Drainage Engineer <br />® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 9 <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.