My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 5:25:31 AM
Creation date
1/11/2012 4:19:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering Services
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C I T Y OF S U N N Y I S L E S <br />T R A F F I C E N G I N E E R I N G S E <br />B E A C H <br />R V I C E S Of) <br />SR- 5 /US -1 OVERSEAS HIGHWAY FROM FONTAINE DRIVE <br />TO S. OF TAVERNIER CREEK BRIDGE - MONROE COUNTY, FL <br />This project consists of 0.80 miles of 4 -lane divided, urban section of SR- 5 located in the Florida Keys. The <br />scope of services included milling and resurfacing, signing and pavement markings, traffic control plans and <br />ADA and pedestrian features upgrades. The project access management analysis resulted in the closure of <br />several unnecessary driveways. Enhanced traffic signal signage was required due to a high rate of <br />accidents at the corridor's one signalized intersection. Additionally the Typical Section was modified to <br />accommodate bicycle lanes without widening. <br />CLIENT <br />Florida Department of <br />Transportation, District 6 <br />1000 N.W. 111 Street <br />Miami, FL 33172 <br />Mr. Danny Iglesias, PE <br />Project Manager <br />Tel: (305) 470- 5289/Fax: (305) 470 -6725 <br />danny.iglesias @dot.state.fl.us <br />RJ BEHAR's ROLE <br />Milling, resurfacing, signing and <br />pavement markings, traffic control plans, <br />ADA and pedestrian upgrades. <br />PROJECT STARTED: 03/4/2010 <br />PROJECT COMPLETED: 08/2011 <br />COST /FEES PAID: $287,382.00 <br />CONSTRUCTION COST: $1,000,000.00 <br />(Estimate) <br />CHANGE ORDERS: None <br />PROJECT LENGTH: 0.80 miles <br />RJ BEHAR's KEY PERSONNEL <br />Javier Rodriguez, PE - Project Manager <br />Andrea Ramudo, ME, El, LEED AP - Project <br />Engineer <br />Rohan Punit, El - Project Engineer <br />Hernando Segura - CAD Designer <br />ElR.J.Behar R. I. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.