My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 5:25:31 AM
Creation date
1/11/2012 4:19:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering Services
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C I T Y OF S U N N Y I S L E S B E A C <br />T R A F F I C E N G I N E E R I N G S E R V I C E S <br />NW 7TH /9TH CONNECTOR <br />FORT LAUDERDALE, FL <br />The project includes the design of a 1.5 mile urban section, 4 -lane divided, connector between NW 7th and <br />NW 9th Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage <br />design, signing and pavement marking and permitting. The project also includes public involvement <br />coordination. Re- evaluation of the contamination screening and evaluation report in accordance with <br />FDOT /PD &E 23, CFR 771 was performed to identify significant environmental impacts, which may have <br />changed after previous environmental reports. Conclusions and recommendations were also provided in <br />order to continue to the next project phase. <br />CLIENT <br />City of Fort Lauderdale <br />101 NE 3rd Avenue, Suite 300 <br />Fort Lauderdale, FL 33301 <br />Ms. Mina Samadi, PE - Project Manager <br />Tel: (954) 828 - 5018 /Fax: (954) 828 -4500 <br />MSamadi @fortlauderdale.gov <br />RJ BEHAR's ROLE <br />Roadway design, signalization, drainage design, <br />signing and pavement marking and permitting <br />PROJECT STARTED: 2008 <br />PROJECT COMPLETED: On -going <br />COST/FEES PAID: $350,000 <br />CONSTRUCTION COST: $3 -5 million <br />(Not including the right -of -way) <br />RJ BEHAR'S KEY PERSONNEL <br />Robert J. Behar, PE - Principal in Charge <br />Javier Rodriguez, PE - Project Manager <br />Anthony V. Alfred, PE - Project Engineer <br />Kelly L. Nowell, PE, LEED AP - Project Engineer <br />Carmen A. Aponte, MSE, CEI - Environmental <br />Engineer <br />Marlin Scattolini - Project Engineer <br />ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.