Laserfiche WebLink
C <br />I T <br />Y <br />OF <br />S <br />U <br />N <br />N <br />Y <br />I <br />S <br />L <br />E <br />S <br />T <br />R A <br />F <br />F I <br />C <br />E N <br />G <br />I <br />N E <br />E <br />R <br />1 N <br />G <br />S <br />E <br />B E A C H <br />R V I C E So <br />NW 87TH AVENUE (SR- 973 /GALLOWAY ROAD) FROM NW 74TH <br />STREET TO NW 103RD STREET - MIAMI -DADS COUNTY, FL <br />The scope of the project consists of final design for the reconstruction of a segment and new construction of <br />NW 87th Avenue (SR- 973 /Galloway Road) from NW 74th Street to NW 103rd Street, within the Town of <br />Medley, Florida. NW 87th Avenue is primarily a north -south urban arterial, Miami -Dade County owned <br />roadway, with a design speed of 45 mph, The proposed improvements will provide a much needed north - <br />south corridor along western Miami -Dade County. RJ Behar is responsible for the roadway design, traffic <br />studies and operations, drainage design, signing and pavement markings and overall coordination. The <br />scope of the project included a traffic study and development of several alternatives for the intersection of <br />Okeechobee Road and NW 87th. The project also includes a new bridge over the Miami Canal. <br />CLIENT <br />Florida Department of <br />Transportation, District 6 <br />1000 NW 111th Street <br />Miami, FL 33172 <br />Ms. Ana Arvelo, PE - Project Manager <br />Tel: (305) 470 - 5210 /Fax: (305) 470 -6725 <br />ana.arvelo ()dot.state.fl.us <br />RJ BEHAR'S ROLE <br />Roadway /traffic control plan (TCP) design, <br />pavement marking and signing, signalization, <br />lighting, drainage /permitting, bridge construc- <br />tion, utility coordination, traffic study, traffic <br />counts, traffic projections and traffic warrants. <br />PROJECT STARTED: 04 /28/2005 <br />PROJECT COMPLETED: On -going <br />COST/FEES PAID: $1,204,000 <br />CONSTRUCTION COST: $12,300,000 (Estimate) <br />PROJECT LENGTH: 1.90 miles <br />RJ BEHAR'S KEY PERSONNEL <br />Robert J. Behar, PE - Quality Assurance/ <br />Officer in Charge <br />Anthony V. Alfred, PE - Project Engineer <br />Juan H. Vazquez, PE, PH, BCEE - Drainage <br />Engineer <br />Carlos Mazorra, PE - Signalization Plans <br />Claudia M. Lamus, PE - Traffic Engineer <br />Carmen A. Aponte, MCE, CEI — Drainage /BHR <br />® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 12 <br />