My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 5:25:31 AM
Creation date
1/11/2012 4:19:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering Services
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F I C E N G I N E E R I N G S E R V I C E S <br />SUNRISE LAKES BOULEVARD - RIGHT -OF -WAY IMPROVEMENTS <br />CITY OF SUNRISE, FL <br />The project consisted of 2.3 miles of rural section, 4 -lane divided streetscape with miscellaneous <br />improvements. It included the addition of valley - gutter on the outside edges of pavement and reconstruction <br />of median curb. The project included the construction of decorative concrete crosswalks with pavers in the <br />median. It also included milling and resurfacing, signing and pavement markings with miscellaneous sidewalk <br />reconstruction. <br />CLIENT <br />City of Sunrise <br />Capital Projects <br />4747 Nob Hill Road, Suite 10 <br />Sunrise, FL 33351 <br />Mr. Alan Gavazzi, AIA <br />Tel: (954) 572 -2487 <br />agavazzi @cityofsunrise.org <br />RJ BEHAR's ROLE <br />Roadway improvements, milling and resurfacing, <br />signing and pavement markings, miscellaneous sidewalk <br />reconstruction, curb and valley - gutter installation and <br />construction administration <br />PROJECT STARTED: 2006 <br />PROJECT COMPLETED: 2009 <br />DESIGN CONTRACT DURATION: 6 Months <br />COST/FEES PAID: $206,854 <br />CONSTRUCTION COST: $2,400,000 <br />CONSTRUCTION DURATION: 12 Months <br />CHANGE ORDERS: None <br />VALUE OF CHANGE ORDERS: NSA <br />RJ BEHAR's KEY PERSONNEL <br />Javier Rodriguez, PE - Project Manager <br />Sonia M. Torres, PE, LEED AP - Project Engineer <br />Hans Ribbeck, PE - Design Engineer <br />Mariana Urdaneta - Designer <br />Marlin Scattolini - Designer <br />f <br />�y <br />j] R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.