Laserfiche WebLink
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F I C E N G I N E E R I N G S E R V I C E S <br />SUNRISE LAKES BOULEVARD - RIGHT -OF -WAY IMPROVEMENTS <br />CITY OF SUNRISE, FL <br />The project consisted of 2.3 miles of rural section, 4 -lane divided streetscape with miscellaneous <br />improvements. It included the addition of valley - gutter on the outside edges of pavement and reconstruction <br />of median curb. The project included the construction of decorative concrete crosswalks with pavers in the <br />median. It also included milling and resurfacing, signing and pavement markings with miscellaneous sidewalk <br />reconstruction. <br />CLIENT <br />City of Sunrise <br />Capital Projects <br />4747 Nob Hill Road, Suite 10 <br />Sunrise, FL 33351 <br />Mr. Alan Gavazzi, AIA <br />Tel: (954) 572 -2487 <br />agavazzi @cityofsunrise.org <br />RJ BEHAR's ROLE <br />Roadway improvements, milling and resurfacing, <br />signing and pavement markings, miscellaneous sidewalk <br />reconstruction, curb and valley - gutter installation and <br />construction administration <br />PROJECT STARTED: 2006 <br />PROJECT COMPLETED: 2009 <br />DESIGN CONTRACT DURATION: 6 Months <br />COST/FEES PAID: $206,854 <br />CONSTRUCTION COST: $2,400,000 <br />CONSTRUCTION DURATION: 12 Months <br />CHANGE ORDERS: None <br />VALUE OF CHANGE ORDERS: NSA <br />RJ BEHAR's KEY PERSONNEL <br />Javier Rodriguez, PE - Project Manager <br />Sonia M. Torres, PE, LEED AP - Project Engineer <br />Hans Ribbeck, PE - Design Engineer <br />Mariana Urdaneta - Designer <br />Marlin Scattolini - Designer <br />f <br />�y <br />j] R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 13 <br />