Laserfiche WebLink
C I T Y OF S U N N Y I S L E S B E A C <br />T R A F F 1 C E N G 1 N E E R 1 N G S E R V I C E S <br />SR- 932/49TH STREET (NW 103RD STREET) <br />FROM W. 2ND AVENUE TO E. 10TH AVENUE - HIALEAH, FL <br />The scope of this project consisted of milling and resurfacing and ADA pedestrian ramp upgrades. The <br />length of the project was 1.576 miles. RJ Behar was responsible for all of the roadway design, pavement <br />marking and signing plans, lighting, drainage, utility coordination and permitting, <br />CLIENT <br />Florida Department of <br />Transportation, District 6 <br />1000 N.W. 111 Street <br />Miami, FL 33172 <br />Mr. Jose A. Barrera, PE - Project Manager <br />Tel: (305) 470 - 5260 /Fax: (305) 470 -6725 <br />jose.barrera @dot.state.fl.us <br />RJ BEHAR's ROLE <br />Roadway design plans, pavement <br />marking & signing, lighting, drainage, <br />utility coordination and permitting <br />PROJECT STARTED: 11/2005 <br />PROJECT COMPLETED: 10//2006 <br />COST /FEES PAID: $154,248.09 <br />CONSTRUCTION COST: $1,323,718 <br />CONSTRUCTION COMPLETION <br />DATE: 01/2008 <br />RJ BEHAR'S KEY PERSONNEL <br />Robert J. Behar, PE - Quality Assurance/ <br />Officer in Charge <br />Israel Magrisso, PE - Project Manager <br />Juan H, Vazquez, PE, PH, BCEE - Drainage Engineer <br />Carlos Mazorra, PE - Roadway /Highway Engineer <br />ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 14 <br />