C I T Y OF S U N N Y I S L E S B E A C H
<br />T R A F F I C E N G 1 N E E R I N G S E R V I C E S
<br />SEAN F. O'KEEFE, PE
<br />QC /REVIEWS
<br />EDUCATION: B.S. Civil Engineering, University of Iowa, 1981
<br />PROFESSIONAL REGISTRATIONS: P.E. Florida License No. 41766, 1989
<br />YEARS OF EXPERIENCE: 29 Years YEARS WITH RJ BEHAR: 2005 —Present
<br />ENGINEERING EXPERIENCE
<br />With over twenty -nine years experience in the project management, planning, design and construction of large civil
<br />engineering projects, Mr. O'Keefe provides a special emphasis on transportation, highways and related structures. Mr.
<br />O'Keefe has considerable project infrastructure support experience in drainage, sewer, utility relocations, lighting,
<br />structures, site development, landscaping and survey. He has integrated an effective blend of traffic analysis and traffic
<br />operations improvements in all of his projects, including signing, striping and signalization. For this contract, he will be
<br />responsible for Quality Control and Quality Assurance as well as assist with any of the transportation projects involved in
<br />this contract.
<br />RELEVANT EXPERIENCE
<br />DESIGN /BUILD FOR THE RECONSTRUCTION OF SE 3rd STREET, BELLE GLADE, FL — FDOT, DISTRICT 4
<br />Project Manager /Engineer of Record — The scope of this project included roadway plans, drainage design, signing and
<br />marking plans, lighting, stormwater permitting and utility relocation plans. The design included the use of filter fabric and
<br />a thick sub -base in lieu of demucking the roadway. The project also included water and sewer plans to be constructed as
<br />part of the roadway improvements.
<br />1 -75 /GRIFFIN ROAD INTERCHANGE, FINAL DESIGN, BROWARD COUNTY, FL — FDOT DISTRICT 4
<br />Project Manager — The scope of the project included roadway improvements, drainage, permitting, bridge, structural,
<br />signing and pavement markings, signalization, lighting, landscaping, utility coordination, pavement design and quantities.
<br />The scope included a study which consisted of the preparation of an Interchange Operational Analysis Report (IOAR) for
<br />the interchange at Griffin Road and 1 -75 in Broward County. The study included Signalized Intersection Analysis,
<br />Weaving Analysis, Queuing Analysis, Ramp Analysis, Interchange Capacity Analysis, and Crash Analysis.
<br />POWERLINE ROAD (SR -845) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4
<br />Project Manager — The project consisted of the resurfacing of 3 miles of Powerline Road in Palm Beach County. This
<br />project involved preparing the Resurface, Restoration and Rehabilitation Report. The project included a safety analysis
<br />and a signal assessment analysis. It also involved extending the concrete sidewalk and stormwater permits.
<br />NW 87th AVENUE (SR- 973 /GALLOWAY ROAD) MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6
<br />Traffic Engineer - He was responsible for the traffic analysis and Level of Service Study for the new route with six
<br />signalized intersections.
<br />NORTHLAKE BOULEVARD OVER THE LOXAHATCHEE SLOUGH — PALM BEACH COUNTY, FL
<br />Project Manager — The project involved reconstruction of a four lane divided highway, building a bridge, weir and
<br />walkway. He was responsible for the geometries, signing and pavement markings, weir placement, grading of the
<br />channel and walkway, quantity calculations and cost estimates.
<br />FLYING COW ROAD ROUNDABOUTS — VILLAGE OF WELLINGTON, FL
<br />Project Manager — RJ Behar prepared the layout of two roundabouts for the Village of Wellington along Flying Cow Road
<br />for future traffic calming. The preparation of the two roundabouts was based on Palm Beach County roadway design
<br />criteria and developed for right -of -way dedication by the adjacent property owners, in this case South Florida Water
<br />Management District (SFWMD).
<br />SW 147th AVENUE — MIAMI -DADE COUNTY PUBLIC WORKS DEPARTMENT, FL
<br />Project Manager — The scope included design replacement of a bridge with a 9'x11' aluminum arch culvert with minor
<br />roadway improvements
<br />SW 9711 AVENUE AND SW 1071h AVENUE BRIDGE DECK RECONSTRUCTION PROJECT — MIAMI -DADE COUNTY
<br />PUBLIC WORKS DEPARTMENT, FL
<br />Bridge Maintenance /Highway Design Engineer — The scope included the design of roadway improvements with bridge
<br />deck replacement, including roadway, drainage, utility relocations, safety improvements and maintenance of traffic.
<br />[] R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 12