My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 5:25:31 AM
Creation date
1/11/2012 4:19:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering Services
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F I C E N G I N E E R 1 N G S E R V I C E S <br />He provided and continues to provide management and technical support for traffic engineering and <br />safety studies, transportation planning, land use planning, including public involvement and coordination with local <br />governments. He provided quality assurance and quality control on all of the above activities. <br />2005 to 2009 — Reviewed more than 70 traffic impact studies for the City of Doral and other municipalities. He also <br />prepared several traffic impact studies for the private sector. He conducted traffic engineering studies for the Florida <br />Department of Transportation (FDOT) District 6 and District 4 and provided traffic engineering analyses and design <br />support for major SIS /FINS PD& E projects, such as portions of the 1 -95 corridor in FDOT District 4 as well as other <br />districts. He successfully managed and completed major studies such as the Transportation Master Plans for Doral, <br />Cutler Bay and Miami Gardens; Transportation Elements for Miami Gardens, Hialeah, Miami Beach and Cutler Bay and <br />Transportation Concurrency Management Areas (TCMA) for Miami Gardens, the TCMA updates for Hialeah and <br />Sarasota; traffic calming studies for Palmetto Bay and numerous traffic engineering studies (including capacity /level -of- <br />service analyses, operations, safety, traffic calming and access management) for Hialeah, Miami, Miami Beach, Miami <br />Gardens, Doral, Cutler Bay and Palmetto Bay. He performed crash /accident analyses to determine the cause and <br />develop improvement recommendations. <br />FLORIDA DEPARTMENT OF TRANSPORTATION, DISTRICT 6 (1981 -2004) <br />- DISTRICT SIX PLANNING MANAGER <br />In charge of the District Planning Office which included managing and directing transportation planning functions and <br />related programs in Miami -Dade and Monroe Counties pursuant to all state and federal requirements. This included <br />managing consulting firms and all fiscal /budget related matters for the Planning Department and traffic engineering <br />analysis support. <br />These areas covered functions such as the Miami -Dade Metropolitan Planning Organization (MPO) Urban <br />Transportation Planning Process; development of transportation improvement projects, Air Quality; Florida Growth <br />Management Process, concurrency reviews /capacity /level -of- service determinations and many reviews of proposed land <br />developments (including DRIs) traffic impacts to the state highway system; functional /jurisdictional designations; access <br />management classifications; Interstate Highway System designations; transportation statistics; transportation planning <br />support to the MPO; transportation management systems and several major traffic engineering, roadway safety and <br />transportation corridor studies, including 1 -95, 1 -395, SR 826 /Palmetto Expressway and Krome Avenue among others. <br />- ASSISTANT DISTRICT TRAFFIC OPERATIONS ENGINEER <br />Responsible for directing and conducting traffic engineering, roadway capacity /level -of service analyses, operations and <br />safety studies for the District to determine needed improvement projects. Responsibilities included traffic regulatory <br />requests and development and preparation of traffic construction plans. He performed crash /accident analyses to <br />determine the cause and develop improvement recommendations. He performed numerous reviews of traffic impact <br />studies on behalf of the District. Tasks and functions included managing engineering consultants. <br />DISTRICT TRAFFIC ENGINEERING DESIGN ENGINEER <br />Managerial position with the overall responsibility of ensuring that traffic engineering design standards and procedures <br />were followed and adhered to Districtwide. He provided guidance and assistance to engineering personnel in evaluating <br />traffic engineering issues, traffic engineering, highway capacity /level -of- service analyses and traffic design related <br />functions. Tasks and functions included managing engineering consultants. <br />- DISTRICT INTERNAL ROADWAY DESIGN ENGINEER <br />Management position responsible for directing the District Roadway Internal Design Unit. He was responsible for <br />overseeing all activities leading to complete preparation of roadway design plans. This included traffic engineering <br />design. Tasks and functions also included managing engineering consultants. <br />While he was employed at FDOT, Mr. De Arazoza was responsible for conducting more than 20 corridor studies, many <br />of which were major undertakings such as FIHS Master and Action Plans and more than 50 traffic operations and safety <br />studies. Most of the corridors studies involved traffic operations and engineering analyses (including roadway <br />capacity /level -of- service analyses) as well as roadway design engineering applications, social, environmental and <br />economic considerations. He also reviewed many traffic impact studies. <br />1] R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.