|
C I T Y OF S U N N Y I S L E S B E A C H
<br />T R A F F I C E N G I N E E R I N G S E R V I C E S
<br />PAOLA RIVEROS, El
<br />DRAINAGE /PERMITTING
<br />EDUCATION: B.S. Civil Engineering, Florida International University, Miami, Florida, April 2001
<br />PROFESSIONAL REGISTRATIONS: E.I. Florida No.100007604, 2002; P.E. Washington, DC No. 905769, 2010
<br />TRAINING /CERTIFICATIONS: Drainage Design using ASAD; FDOT CADD Update Training Seminar; Bentley
<br />MicroStation V8 User Update; ICPR Hands -On Training Seminar, Streamline Technologies, Inc.; Design of Storm
<br />Sewers and Pavement Drainage, Water Resources Learning Center; FDOT CADD Update Training Seminar; FDOT
<br />PPM Design Update Training; Bentley Geopack Conference; GIS Training
<br />YEARS OF EXPERIENCE: 10 Years YEARS WITH RJ BEHAR: 2001 —Present
<br />ENGINEERING EXPERIENCE
<br />Ms. Riveros has been responsible for the preparation of roadway plans and site plans throughout South Florida. She
<br />has assisted in drainage computations for FDOT and City projects. She has also performed construction cost estimates
<br />for improvements that included street construction, buildings construction, and landscaping projects. Her responsibilities
<br />have included the preparation of drawings in MicroStation and AutoCAD for civil and roadway projects. At RJ Behar, Ms.
<br />Riveros is responsible for support in drainage and permitting projects. She drafted and performed revisions to site,
<br />utility, drainage, and landscaped plans. Ms. Riveros has more than ten years of experience.
<br />RELEVANT EXPERIENCE
<br />DESIGN/BUILD FOR 1.595 FINAL DESIGN, BROWARD COUNTY, FL — FDOT, DISTRICT 4 (AECOMIDRAGADOS)
<br />Project Engineer involved with drainage design for several sections of the corridor. Design tasks include exfiltration
<br />trench design, storm sewer design and analysis, and both wet and dry retention stormwater management pond designs.
<br />The design involved the use of spreadsheets, ICPR, ASAD and Microstation
<br />NORTH COUNTY NEIGHBORHOOD IMPROVEMENT PROJECT — BROWARD COUNTY, FL
<br />Project Engineer in charge of drainage design and permitting.
<br />NW 87th AVENUE (SR- 973 /GALLOWAY ROAD) MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6
<br />Project Engineer — She prepared the drainage plans for new construction of a major arterial. The scope includes final
<br />design and future new reconstruction, roadway design, traffic operations, drainage, structure and construction.
<br />SR -A1A RESURFACING PROJECT, PALM BEACH COUNTY, FL — FDOT, DISTRICT 4
<br />Project Designer for RRR project, from the Boynton Inlet Bridge to SR -802 (Lake Worth). The project included milling
<br />and resurfacing for 4 miles and reconstruction of 1 mile of a major rural roadway, as well as drainage improvements,
<br />coastal drainage studies, pavement marking and signing, overhead signing plans, lighting plans, three signal locations,
<br />bridge plans, wetland mitigation, public involvement, design documentation and landscape plans.
<br />POWERLINE ROAD (SR -845) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4
<br />Project Designer — The project included milling and resurfacing of 3 miles of a major collector, 8 signal upgrades, safety
<br />improvements and miscellaneous drainage improvements.
<br />SR- 5 /US -1 RESURFACING, BOCA RATON, FL — FDOT, DISTRICT 4
<br />Project Engineer Designer — The project consisted of milling and resurfacing the existing pavement; upgraded signal
<br />pedestrian features to current ADA standards. The scope also included new signing and pavement markings and
<br />upgrading landscaping.
<br />US -1 (FEDERAL HIGHWAY) HALLANDALE BEACH, FL — FDOT DISTRICT 4
<br />Project Designer — This RRR project went from the County Line to Hallandale Beach Boulevard. This project included
<br />the design of a 0.8 miles, six -lane, urban, divided highway as well as minor drainage Improvements.
<br />HOLLYWOOD BOULEVARD (SR -820) FROM SR -A1A TO US -1 — FDOT, DISTRICT 4
<br />Project Engineer for the preparation of drainage plans, including coordination with utilities.
<br />SOUTHERN BOULEVARD (SR -80) DRAINAGE DESIGN — FDOT, DISTRICT 4
<br />Project Engineer — She performed area calculations and input data into AdICPR stormwater model. She performed
<br />floodplain volume compensation calculations.
<br />BLUE HERON BOULEVARD — FDOT DISTRICT 4
<br />Drainage Designer — She was responsible for the preparation of drainage plans.
<br />® R.j.Behar R. J. BEHAR & COMPANY, INC. I RFQ N0. 11 -11 -01 1 19
<br />
|