Laserfiche WebLink
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F I C E N G 1 N E E R 1 N G S E R V I C E S <br />ALTON ROAD (SR -907) — FDOT DISTRICT 6 <br />Project Engineer who prepared the roadway plans for 4 miles of a 3R project as well as drainage structure sheets and <br />details. <br />KINGS HIGHWAY (SR -713) RESURFACING — FDOT DISTRICT 4 <br />Project Engineer— She assisted in the preparation of the 3R report. She prepared the Summary of Crash Analysis. <br />ANDREWS AVENUE — FDOT DISTRICT 4 (KEITH & SCHNARS, PA) <br />Project Engineer— Preparation of pond sitting report. <br />PALM AVENUE FINAL DESIGN FROM OKEECHOBEE ROAD TO 21St STREET — CITY OF HIALEAH, FL <br />Project Engineer — Responsible for the preparation of construction drawings for roadway reconstruction and <br />improvements on Palm Avenue. <br />NORTHLAKE BOULEVARD BRIDGE OVER THE LOXAHATCHEE SLOUGH - PALM BEACH COUNTY, FL — FDOT <br />DISTRICT 4 <br />Project Engineer — Developed the preliminary HEC -RAS model for the new channel. Scope of services consisted of <br />bridge design, drainage design, roadway improvements and permitting. RJ Behar is designing the relocation of 1,310 <br />feet of 20 inch water main and 1,299 feet of 16 inch force main. The new water main and force main will be relocated on <br />the new bridge. RJ Behar prepared all the details and structural design to accommodate the new utilities on the bridge. <br />NEIGHBORHOOD PARTICIPATION PROGRAM — CITY OF SUNRISE, FL <br />Project Engineer — She prepared cost estimates for eighteen neighborhood improvement projects. The project included <br />performing field investigations to determine the project scope to estimate the quantities and cost for the improvements. <br />VARIOUS COMMUNITIES — CITY OF SUNRISE, FL <br />Project Engineer — She prepared cost estimates for 18 communities as part of the Neighborhood Participation Program. <br />The scope of the project included new entry signs, landscaping, lighting, sidewalks, pavers and general improvements. <br />ANSIN BOULEVARD — CITY OF HALLANDALE BEACH, FL <br />Project Engineer for the reconstruction of one mile of City streets. <br />SW 62 ^d COURT — TOWN OF SOUTHWEST RANCHES, FL <br />Project Engineer— She prepared roadway reconstruction plans and drainage plans. <br />NE 15th AVENUE — CITY OF FORT LAUDERDALE, FL <br />Project Engineer — Responsible for the master plan and public Involvement for a 0.8 mile roadway in Fort Lauderdale, <br />Florida, which included resurfacing plans, marking and signing plans, landscape plans. <br />NW/NE 13th STREET — CITY OF FORT LAUDERDALE, FL <br />Project Engineer — Responsible for the master plan and public Involvement for a 2.1 mile roadway in Fort Lauderdale, <br />Florida, which included resurfacing plans, marking and signing plans, landscape plans. <br />C -4 CANAL FLOOD PROTECTION PROJECT, CITY OF SWEETWATER, FL — SOUTH FLORIDA WATER <br />MANAGEMENT DISTRICT <br />Project Engineer for drainage design along C -4 canal north bank and flood protection cut -off wall. <br />W. 771h STREET — CITY OF HIALEAH, FL <br />Project Engineer— She prepared roadway reconstruction plans and drainage plans. <br />W. 371h STREET — CITY OF HIALEAH, FL <br />Project Engineer— She prepared roadway reconstruction plans and drainage plans. <br />W. 33rd STREET PHASES I AND II — CITY OF HIALEAH, FL <br />Project Engineer— She prepared roadway reconstruction plans and drainage plans. <br />W. 741h STREET — CITY OF HIALEAH, FL <br />Project Engineer — She prepared roadway reconstruction plans and drainage plans. <br />® R.J.Behar R. ]. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 20 <br />