Laserfiche WebLink
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F I C E N G I N E E R I N G S E R V I C E S <br />OKEECHOBEE BOULEVARD (SR -714) CEI — PALM BEACH COUNTY, FL <br />Project Administrator responsible for overseeing the roadway construction improvements on Okeechobee Boulevard, <br />between Australian Avenue and Parker /Tamarind Avenue. The improvements under this contract consist of providing a <br />new second left hand turn lane on the west approach to the intersection, an auxiliary lane to allow for eastbound traffic <br />exiting Australian Avenue to enter and merge onto Okeechobee Boulevard, a right turn lane to provide westbound traffic <br />turning onto Australian Avenue, milling and resurfacing of existing pavements, drainage improvements, sidewalks, a new <br />combined traffic /rail signal system, lighting, signing and pavement markings, and tree relocation. The typical section <br />consists of a 6 -lane urban divided arterial with curb and gutter approaching the CSX/Tri -Rail at -grade gated crossing. <br />Signal and crossing gates will be installed by CSX's Railroad contractor and coordinated with the County's roadway <br />approach and joint signal installations. Project length: 0.3 miles . <br />W. 36th AVENUE (FROM WEST 76th STREET TO WEST 84th STREET) CEI — CITY OF HIALEAH, FL; AMERICAN <br />RECOVERY & REINVESTMENT ACT (ARRA) <br />Project Administrator — He was responsible for overseeing the reconstruction of West 361h Avenue from West 76th Street <br />to West 84th Street within the City of Hialeah. The general overview and scope for this project comprised of the complete <br />reconstruction of West 36th Avenue, including new sidewalk, curb and gutter, drainage improvements - new drainage <br />inlets, 18" storm sewer cross drainage pipe, 1,271 LF of 18" exfiltration trench (French drain). The project scope also <br />included pavement milling and resurfacing, signing and pavement markings, street lighting, tree removal, and grading of <br />the adjacent swale areas and sod restoration with Performance Turf. Project length: 0.5 miles <br />W. 53rd STREET (FROM W. 411 AVENUE TO W. 81h AVENUE) CEI — CITY OF HIALEAH, FL; AMERICAN RECOVERY <br />& REINVESTMENT ACT (ARRA) <br />Project Administrator for the West 53rd Street ARRA- Funded reconstruction projects within the City of Hialeah. The <br />general overview and scope for this project comprised the complete reconstruction of West 5314 Street, including new <br />sidewalk, curb and gutter, drainage improvements - new drainage inlets,18" storm sewer cross drainage pipe, 18" <br />exfiltration trench (French drain). Proposed in the project scope are pavement milling and resurfacing, signing and <br />pavement markings and grading of the adjacent swale areas and sod restoration with Performance Turf. <br />W. 53rd STREET (FROM W. 8th AVENUE TO W. 121h AVENUE) CEI — CITY OF HIALEAH, FL; AMERICAN <br />RECOVERY & REINVESTMENT ACT (ARRA) <br />Project Administrator for the West 53rd Street ARRA- Funded reconstruction projects within the City of Hialeah. The <br />general overview and scope for this project comprised the complete reconstruction of West 53,d Street, including new <br />sidewalk, curb and gutter, drainage improvements - new drainage inlets,18" storm sewer cross drainage pipe, 18" <br />exfiltration trench (French drain). Proposed in the project scope are pavement milling and resurfacing, signing and <br />pavement markings and grading of the adjacent swale areas and sod restoration with Performance Turf. Project length: <br />0.5 miles <br />CONSTRUCTION MANAGEMENT OVERSIGHT — CITY OF LAUDERDALE LAKES, FLORIDA <br />Project Administrator — This project consisted of construction of "The Island "at Veteran's Memorial Park located at the <br />intersection of SR -7 and SW 361h/371h Street. RJ Behar advised the City of Lauderdale Lakes during construction and <br />worked with the City to close out the project. Also, RJ Behar helped the City obtain FDOT certification for Local Agency <br />Program (LAP) funding for this project as well as other capital improvement projects before construction. <br />RIVERWALK SOUTH REGIONAL PARK RESIDENT PROJECT REPRESENTATIVE — CITY OF FORT <br />LAUDERDALE, FL "CITY OF FORT LAUDERDALE COMMUNITY APPEARANCE AWARD — MAY 8TH 2008" <br />(CATEGORY 6.02) <br />Construction Project Manager — This project consisted of reconstruction and improvements to a portion of the Riverwalk <br />Regional Park between SE 3rd Avenue and Andrews Avenue, which included a new fire line, new vacuum sewer line, <br />replaced overhead utilities to underground, installed 14 new marine power stations and evacuation pedestals, replaced <br />the existing two -way road with a one -way paver road, coordinated seawall repair, new tropical landscaping and a new <br />lighting system. Value $ 3,000,000. <br />1-75/PINES BOULEVARD BRIDGE DECK REPAIR, CITY OF PEMBROKE PINES, FL — FDOT DISTRICT 4 <br />Project Administrator /Senior Inspector — Inspector responsible for overseeing the demolition and reconstruction of the <br />concrete bridge deck on Pines Boulevard (SR -820) over the 1 -75 (SR -93) Interchange within the City of Pembroke Pines. <br />The improvements under this contract consist of the removal and demolition of the existing concrete bridge deck to a <br />depth of 3.5 inches, or Y2 inch below the top mat of reinforcing steel, sandblasting, check for steel deterioration, and re- <br />install /splice new reinforcing steel as necessary; and final placement, casting, and curing of the new concrete overlay <br />deck. Project length: 0.2 miles. <br />® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 31 <br />