Laserfiche WebLink
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F 1 C E N G I N E E R I N G S E R V I C E S <br />NANETTEAKYAZ <br />HIGHWAY DESIGNISIGNING, PAVEMENT MARKING & CHANNELIZATION <br />EDUCATION: A.A. Degree, Broward Community College, Davie, Florida, 1992 <br />PROFESSIONAL REGISTRATIONS: Not Applicable <br />TRAINING /CERTIFICATIONS: 2002 FDOT CAD Update Training Seminar; 2002 FDOT PPM Design Update <br />Training; Florida International University - AutoCAD Release 12; FDOTTICE - Load and Resistance Factor Design <br />(LRFD) Training; Geopak Road 1 Training <br />YEARS OF EXPERIENCE: 10 Years YEARS WITH RJ BEHAR: 2001 —Present <br />ENGINEERING EXPERIENCE <br />At RJ Behar, Ms. Akyaz is responsible for plans preparation in both MicroStation and CAD software for roadway and <br />civil engineering projects. She has 12 years of experience in plans preparation on civil engineering projects. <br />RELEVANT EXPERIENCE <br />EAST 4th AVENUE STREET ASSESSMENT — CITY OF HIALEAH, FL <br />Responsible for the drafting of driveways, sidewalks and ADA ramps; curb and gutter, drainage, pavement, and <br />utilities. The scope consisted of General engineering services for the assessment of sidewalks, ADA compliance and <br />cost estimate for repairs or reconstruction of sidewalks of two segments of this roadway; from Hialeah Drive to East <br />216t Street and from East 32nd Street to East 53rd Street. <br />DESIGN /BUILD FOR THE RECONSTRUCTION OF SE 3rd STREET, BELLE GLADE, FL — FDOT DISTRICT 4 <br />Project Designer responsible for the production of roadway plans, signing and pavement marking plans and <br />quantities for this design /build project. The scope of this project included roadway plans, drainage design, signing & <br />marking plans and utility relocation plans. The design included the use of filter fabric and a thick sub -base in lieu of <br />demucking the roadway. <br />POWERLINE ROAD (SR -845) PALM BEACH COUNTY, FL — FDOT DISTRICT 4 <br />Project Engineer responsible for the preparation of roadway quantities, computation book and transport input. The <br />scope included complete design for widening and resurfacing of 3 miles of a major arterial roadway, including; <br />drainage design, pavement marking and signing, overhead signing plans, lighting plans, seven signal locations, <br />structural plans (bridge widening), a public involvement program and landscape improvements. The project also <br />included a safety analysis and a signal assessment analysis. <br />SR -A1A (FROM COUNTY ROAD TO FLAGLER MEMORIAL BRIDGE) PALM BEACH COUNTY, FL — FDOT, <br />DISTRICT 4 <br />Roadway Designer — The project consisted of milling and resurfacing of 0.25 miles of a 4 -lane divided highway for <br />FDOT, District 4). She was responsible for the drafting of roadway plans, drainage, traffic control, signalization, utility <br />relocation, as well as, the design and drafting of signing and markings and lighting plans including lighting <br />calculations. She was in charge of the quantities input in the FDOT CES system. <br />1 -75 /GRIFFIN ROAD INTERCHANGE, BROWARD COUNTY, FL — FDOT DISTRICT 4 <br />Roadway Designer — The scope consists of improvements including modifications to the interchange by realigning <br />the 1 -75 ramps to converge at a new signalized intersection. Her responsibilities include the geometrics, signing and <br />pavement markings, signalization and long range estimates. <br />NW 146th STREETINORTH MIAMI AVENUEIS RIVER DRIVE — MIAMI -DADE COUNTY, FL <br />Roadway Designer — She assisted in the preparation of layout and final construction plans for a roundabout based on <br />Miami -Dade County roadway design criteria in the City of North Miami. The roundabout connects N. Miami Avenue, <br />South River Drive and NW 146th Street. The purpose of the project was to provide traffic calming in this <br />neighborhood. <br />NORTHLAKE BOULEVARD OVER THE LOXAHATCHEE SLOUGH — PALM BEACH COUNTY, FL <br />Roadway Designer — The project consisted of reconstruction of a four lane divided highway, construction of a bridge, <br />weir and walkway. She was responsible for the geometrics, signing and pavement markings, weir placement and <br />grading of the channel and walkway, quantity calculations and cost estimates. <br />E] R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 32 <br />