Laserfiche WebLink
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F I C E N G 1 N E E R 1 N G S E R V I C E S <br />PALM AVENUE (W. 45th STREET TO W. 47th STREET) — CITY OF HIALEAH, FL <br />Roadway Designer - She prepared the plans for milling and resurfacing Palm Avenue from East 451h Street to East <br />47th Street. The project also included adding curb ramps to comply with ADA standards, replacing sidewalk, <br />driveways and curb and gutter as needed, cleaning, sealing and adjusting drainage manholes and inlets and signing <br />and pavement markings <br />US-1/SR-5 - ST. LUCIE COUNTY, FL — FDOT, DISTRICT 4 <br />Roadway Designer— Responsible for the signalization plans. <br />1.95 PUMP STATION, PEMBROKE PARK, FL— FDOT, DISTRICT 4 <br />Roadway Designer— She prepared the roadway plans for reconstruction of 3011 Avenue. <br />US-1/SR-5, MIAMI -DADE COUNTY LINE TO HALLANDALE BEACH BOULEVARD — FDOT, DISTRICT 4 <br />Roadway Designer — She prepared the typical section package and quality control review. <br />SR -80 CRESTWOOD TO 105th AVENUE — FDOT, DISTRICT 4 <br />Roadway Designer — She prepared the roadway, signing and marking and drainage plans. <br />TOWN CENTER ROADWAY STUDY — CITY OF CORAL SPRINGS, FL <br />Roadway Designer — She prepared layouts of the bus stations and connecting roadways for transit improvements. <br />MILANDER PARK STREETSCAPE — CITY OF HIALEAH, FL <br />Roadway Designer — She prepared master plans for East 47th and East 48th Street from Palm Avenue to East 1St <br />Avenue. <br />WILDE PARK — CITY OF HIALEAH, FL <br />Roadway Designer — She prepared the site, paving and drainage design plans. <br />BUCKY DENT PARK DESIGN — CITY OF HIALEAH, FL <br />Roadway Designer — Responsible for the design to address flooding problems at the park. <br />WEST 37th STREET — CITY OF HIALEAH, FL <br />Roadway Designer — Responsible for the roadway plans for reconstruction of W 37th Street. <br />E. 6th AVENUE (FROM E. 9th STREET TO HIALEAH DRIVE), E. 5th STREET (FROM E. 4th AVENUE TO E. 6th <br />AVENUE), E. 5th STREET (FROM E. 6th AVENUE TO E. 8th AVENUE) — CITY OF HIALEAH, FL <br />Roadway Designer — She was responsible for the drafting of roadway plans, drainage, traffic control, signalization, <br />utility relocation, as well as the design and drafting of signing and markings plans and lighting including lighting <br />calculations. <br />E. 1 St AVENUE — CITY OF HIALEAH, FL <br />Roadway Designer — She prepared roadway plans, drainage design, signing and marking, signal plans, conversion of <br />overhead to underground utilities. The project consisted of the reconstruction of 1.6 miles of City Street, conversion <br />from one -way to two -way traffic. <br />E. 10th, 11th, 12th, 13th, 14th, 15th STREET (FROM PALM AVENUE TO EAST 1St AVENUE) — CITY OF HIALEAH, FL <br />Roadway Designer - Prepared roadway plans, drainage design, signing and marking. The project consisted of <br />reconstruction of approximately 3700 feet of City Street. <br />E. 10th, 11th, 12th, 13th, 14th, 15th (FROM EAST 1stAVENUE TO EAST 2nd AVENUE) — CITY OF HIALEAH, FL <br />Roadway Designer — She prepared roadway plans, drainage design, signing and marking and utility coordination. <br />The project consists of reconstruction of 3,700 feet of City Street. <br />E. 16th, E. 17th E. 18th 19th, 20th (FROM PALM AVENUE TO EAST 1St AVENUE) — CITY OF HIALEAH, FL <br />Roadway Designer — She was responsible for the roadway plans, drainage design, signing and marking and utility <br />coordination. The project consists of reconstruction of 3,000 feet of City Streets. <br />E. 16th 18th 19th, 20th STREET, CURTIS DRIVE (FROM EAST 1st AVENUE TO EAST 2nd AVENUE) — CITY OF <br />HIALEAH, FL <br />Roadway Designer — She prepared roadway plans, drainage design, signing plans, utility coordination. The project <br />consisted of reconstruction 3700 feet of City Streets. <br />ElR.).Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 33 <br />