Laserfiche WebLink
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F I C E N G I N E E R I N G S E R V I C E S <br />RICHARD BOLT <br />UTILITY COORDINATION <br />EDUCATION: B.S. Building Construction, Auburn University, AL, 1978 <br />REGISTRATIONS: SBCCI Building Inspector; P.E. Maryland No.14562; P.E. Virginia No. 16025; P.E. District of <br />Columbia, No. 8214 <br />TRAINING: Design of Roadway Drainage Systems- Advanced Geotech Systems 2003 (.6 CEU's) <br />YEARS OF EXPERIENCE: 30 Years YEARS WITH RJ BEHAR: 2003 —Present <br />ENGINEERING EXPERIENCE <br />Mr. Bolt has extensive multi - disciplined experience in; civil, structural, and construction engineering and administration, <br />architectural design, inspections, general contracting and custom computer applications. Mr. Bolt's responsibilities <br />comprise of: construction management and observations, Computer -Aided Design (CAD), calculations for site layout, <br />grading and paving, storm drainage, water systems and sanitary sewer systems. In addition, Mr. Bolt reviews shop <br />drawing submittals, to be in compliance with construction documents, performs field inspections in order to monitor <br />contractor performance, and estimates construction costs. During his career, his successful completion of numerous <br />municipal projects, demonstrates his skillful and effective management for difficult and complex projects. <br />RELEVANT EXPERIENCE <br />POWERLINE ROAD (SR -845) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4 <br />Project Engineer in charge of a 3 mile RRR project which involved utility coordination, procurement of utility schedules, <br />color -coded plans and utility cost estimates. The scope of the project consisted of complete design of widening and <br />resurfacing three miles of a major arterial roadway, including drainage design, pavement marking and signing, overhead <br />signing plans, lighting plans, seven signal locations, major culvert (72 -inch) replacement, structural plans (bridge <br />widening) and deck replacement, public involvement program and landscape improvements. The project installed 8 <br />major signalized intersections with galvanized mast arms. Signal analysis and new signal timings were developed using <br />the Synchro model. <br />SR -AIIA, PALM BEACH COUNTY, FL — FDOT, DISTRICT 4 <br />Project Engineer — He was responsible for the utility coordination, and contacts for a 5 mile RRR project. The project <br />included a major drainage study and improvements, milling and resurfacing, bridges, signal improvements, signing and <br />marking plans. This project required coordination with endangered species and seagrass surveys, preservation of two <br />historical properties, and coordination of impacts to 4F (Boynton Beach Inlet park) properties. A coastal construction line <br />was obtained, as well as an agreement with the Fish and Wildlife Commission, for the safety of any impact to sea turtles, <br />from the proposed lighting design. He prepared the maintenance of traffic plans. <br />EPD (ENVIRONMENTAL PROTECTION DEPARTMENT) LABORATORY GREEN BUILDING — BROWARD COUNTY <br />ENGINEERING <br />Civil Engineer — The scope included drainage design, signage, permitting, and utility coordination. <br />OLIVE AVENUE WATER AND SANITARY SEWER REPLACEMENT PROJECT — CITY OF WEST PALM BEACH, FL <br />Project Manager — Designed the complete replacement and upgrade of the water and sanitary sewer system, on a 1.5 <br />mile urban section of Olive Avenue, starting from Lakeview Avenue and ending at Palm Beach Lakes Boulevard in the <br />downtown area. The project was performed under a joint project agreement between the city of West Palm Beach and <br />FDOT during the reconstruction of the roadway. The utility coordination involved with this project was very complex <br />owing to the density of utilities in this older urban section of the downtown. <br />US -27 MILLING AND RESURFACING DESIGN BUILD — FDOT, DISTRICT 4 <br />Project Engineer responsible for an FDOT mill and resurfacing design build project, for US -27, from Dade /Broward <br />county line north of Griffin Road. The project included widening a section for an acceleration lane, signing and pavement <br />marking upgrades and several signal and lighting improvements. <br />ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 34 <br />