|
C I T Y OF S U N N Y I S L E S B E A C H
<br />T R A F F I C E N G I N E E R I N G S E R V I C E S
<br />RICHARD BOLT
<br />UTILITY COORDINATION
<br />EDUCATION: B.S. Building Construction, Auburn University, AL, 1978
<br />REGISTRATIONS: SBCCI Building Inspector; P.E. Maryland No.14562; P.E. Virginia No. 16025; P.E. District of
<br />Columbia, No. 8214
<br />TRAINING: Design of Roadway Drainage Systems- Advanced Geotech Systems 2003 (.6 CEU's)
<br />YEARS OF EXPERIENCE: 30 Years YEARS WITH RJ BEHAR: 2003 —Present
<br />ENGINEERING EXPERIENCE
<br />Mr. Bolt has extensive multi - disciplined experience in; civil, structural, and construction engineering and administration,
<br />architectural design, inspections, general contracting and custom computer applications. Mr. Bolt's responsibilities
<br />comprise of: construction management and observations, Computer -Aided Design (CAD), calculations for site layout,
<br />grading and paving, storm drainage, water systems and sanitary sewer systems. In addition, Mr. Bolt reviews shop
<br />drawing submittals, to be in compliance with construction documents, performs field inspections in order to monitor
<br />contractor performance, and estimates construction costs. During his career, his successful completion of numerous
<br />municipal projects, demonstrates his skillful and effective management for difficult and complex projects.
<br />RELEVANT EXPERIENCE
<br />POWERLINE ROAD (SR -845) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4
<br />Project Engineer in charge of a 3 mile RRR project which involved utility coordination, procurement of utility schedules,
<br />color -coded plans and utility cost estimates. The scope of the project consisted of complete design of widening and
<br />resurfacing three miles of a major arterial roadway, including drainage design, pavement marking and signing, overhead
<br />signing plans, lighting plans, seven signal locations, major culvert (72 -inch) replacement, structural plans (bridge
<br />widening) and deck replacement, public involvement program and landscape improvements. The project installed 8
<br />major signalized intersections with galvanized mast arms. Signal analysis and new signal timings were developed using
<br />the Synchro model.
<br />SR -AIIA, PALM BEACH COUNTY, FL — FDOT, DISTRICT 4
<br />Project Engineer — He was responsible for the utility coordination, and contacts for a 5 mile RRR project. The project
<br />included a major drainage study and improvements, milling and resurfacing, bridges, signal improvements, signing and
<br />marking plans. This project required coordination with endangered species and seagrass surveys, preservation of two
<br />historical properties, and coordination of impacts to 4F (Boynton Beach Inlet park) properties. A coastal construction line
<br />was obtained, as well as an agreement with the Fish and Wildlife Commission, for the safety of any impact to sea turtles,
<br />from the proposed lighting design. He prepared the maintenance of traffic plans.
<br />EPD (ENVIRONMENTAL PROTECTION DEPARTMENT) LABORATORY GREEN BUILDING — BROWARD COUNTY
<br />ENGINEERING
<br />Civil Engineer — The scope included drainage design, signage, permitting, and utility coordination.
<br />OLIVE AVENUE WATER AND SANITARY SEWER REPLACEMENT PROJECT — CITY OF WEST PALM BEACH, FL
<br />Project Manager — Designed the complete replacement and upgrade of the water and sanitary sewer system, on a 1.5
<br />mile urban section of Olive Avenue, starting from Lakeview Avenue and ending at Palm Beach Lakes Boulevard in the
<br />downtown area. The project was performed under a joint project agreement between the city of West Palm Beach and
<br />FDOT during the reconstruction of the roadway. The utility coordination involved with this project was very complex
<br />owing to the density of utilities in this older urban section of the downtown.
<br />US -27 MILLING AND RESURFACING DESIGN BUILD — FDOT, DISTRICT 4
<br />Project Engineer responsible for an FDOT mill and resurfacing design build project, for US -27, from Dade /Broward
<br />county line north of Griffin Road. The project included widening a section for an acceleration lane, signing and pavement
<br />marking upgrades and several signal and lighting improvements.
<br />ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 34
<br />
|