My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consulting Eng. & Science, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
CES Consulting Eng. & Science, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 2:56:08 AM
Creation date
1/11/2012 4:36:48 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consulting Engineering & Science Inc <br />Task 2: Design Development <br />e <br />It is during this task that most, or all, of the items undefined in the Conceptual Plan <br />becomes defined. The entry feature from the Collins Avenue to the commercial property <br />will be defined in both plan and profile. <br />The traffic signal at Collins Avenue and 183rd Street is on an FDOT roadway. However, <br />it is operated and maintained by Miami -Dade County. The CES Team is aware that the <br />plans for modifying the existing traffic signal must be reviewed and approved by Miami - <br />Dade County, therefore the CES Team will provide a preliminary (60 %) design for initial <br />County (MDPWD) review. The design will utilize approved FDOT signal mast arms <br />instead of the standard County mast arms. <br />It is anticipated that a significant dialog between the City and the CES Team will be <br />maintained during this period to insure that the project's goals are adequately met. Initial <br />construction cost estimates will be prepared in this task, which will be continually <br />updated as the design development and final design tasks proceed. <br />The design will incorporate all relevant Florida Building Codes (FBC), Florida <br />Department of Transportation (FDOT) standards, Miami -Dade County Public Works <br />Department standards, and other applicable Federal or State standards. <br />Task 3: Final Design / Construction Documents <br />Once the Design Development task is complete and all applicable City internal approvals <br />are secured, the CES Team will begin the Final Design / Construction Documents task of <br />this project. Technical specifications will be prepared to be incorporated with the City's <br />() standard front -end documents. These drawings and specifications will be such that the <br />entire project can be permitted and constructed. It is understood that there will be project <br />reviews at various milestones in the Construction Documents task; and, the submittal for <br />each milestone will include an updated construction cost estimate. Construction cost <br />estimates will be the basis for evaluation of bid tabulations from prospective bidders. <br />Task 4: Permitting <br />Having held initial meetings with each of the applicable regulatory agencies in Task 1, <br />the actual permitting stage of the project will commence upon substantial completion of <br />the construction documents. Necessary permit applications will be prepared, along with <br />accompanying drawings and supporting data; and, these applications will be submitted as <br />early as is practical. The CES Team will maintain an on -going dialog with each agency <br />on a regular basis to insure that their review is proceeding in a timely manner and to <br />respond to any questions or requests for additional information. <br />After County traffic signal comments are received, the CES Team will complete the <br />signal modification plan set along with a Special Provisions booklet. The City of Sunny <br />City RFP No. I1 -I1 -01 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.