Laserfiche WebLink
I L Calvin, Giordano & Associates, Inc. <br />E X C E C T 1 0 N A L S 0 L U T 1 0 N$ <br />A <br />CARMELO CARATOZZOLO, PE <br />j Traffic Engineer <br />SUMMARY OF QUALIFICATIONS <br />Mr. Caratozzolo has over nine years of traffic engineering experience that includes <br />engineering and planning support services in the areas of traffic impact studies, <br />operational analyses, traffic calming, and data collection. He has worked with both <br />private and public sector clients on a wide range of projects. Additionally, Mr. <br />Caratozzolo has vast knowledge of traffic engineering software such as Synchro and <br />Highway Capacity Software. <br />PROJECT EXPERIENCE <br />State Route 54A, Penn Yan, NY: The project was a rehabilitation of six miles of State <br />Route 54A in the Town of Jerusalem, Yates County, between Branchport and the Penn <br />Yan Village line. The project, funded by the American Recovery and Reinvestment Act <br />J (ARRA), repaired pavement joints, resurfaced the highway and replaced a closed <br />drainage system at Bluff Point. The project also consisted of constructing dedicated turn <br />lanes and updated signs and guide rail. Responsibilities include construction inspection. <br />J Trailways Bus Terminal Relocation, Rochester NY: The project scope was to <br />construct a new bus terminal on an existing parking lot. Extensive modification of the <br />existing site included new curb and pavement, concrete sidewalks, utility connections, <br />signs, pavement markings to provide the necessary building pad, bus parking, customer <br />parking, vehicle circulation, and pedestrian accommodations on the site. A very tight <br />coordination with the client and various State and Local agencies was the key to meeting <br />the aggressive project schedule and budget. <br />F <br />Connector Road, Auburn NY: Locally Administered project involving the construction <br />of a new two mile road connection from North Street to Grant Avenue. Responsibilities <br />include traffic capacity analysis utilizing Synchro, traffic signal design, and maintenance <br />& protection of traffic. <br />Cypress Key Town Centre Royal Palm Beach FL: Signal warrant analysis and <br />signalization plans involving the projection of anticipated traffic volumes based on the <br />proposed plan of development. Construction plan included design for new sidewalks, <br />curbing, median modifications, and turn lane modifications.til <br />Flavor Pict Road and Hagen Ranch Road, Palm Beach County FL: Signalization plans <br />for a four -way intersection including quantities, signal equipment quantities, design for <br />l video detection, specifications for mast arm assemblies, and foundation criteria. <br />Construction plan included design for new sidewalks, curbing, and median <br />modifications.tll <br />Quillen Development of Regional Impact, Indiantown, FL: Detailed traffic analysis of <br />the surrounding roadway network impacted by the proposed plan of development of <br />2250 residential dwelling units, 150,000 square feet of retail area, and a 15 acre private <br />school facility. Project also included proportionate fair share cost calculations for all <br />required roadway improvements. <br />EDUCATION <br />Bachelor of Science — <br />Civil Engineering, <br />Syracuse University <br />PROFESSIONAL <br />CREDENTIALS <br />Professional Engineer, <br />FL, No. 69067 <br />PROFESSIONAL <br />AFFILIATIONS <br />Institute of <br />Transportation Engineers <br />PROJECT <br />ATTRIBUTION NOTES <br />t11 Project <br />Manager /Senior <br />Engineer, Simmons & <br />White Inc (2005 — <br />2009) <br />[2] Traffic Engineer, URS <br />Corporation (2004 — <br />2005) <br />[3] Project Engineer, <br />McMahon Associates <br />Inc (2003 — 2004) <br />Page 317 <br />