Laserfiche WebLink
/ ) <br /> <br />I <br />-j <br />I <br /> <br />I <br />I <br /> <br />CITY OF <br /> <br /> <br />SUN N Y <br /> <br />ISLES <br /> <br />BEACH <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />) <br /> <br />SR-836/SR-826 (SECTION 5) PLANS REVIEW - MDX (EAC CONSULTING, INC.) <br />Reviewed the Maintenance of Traffic Master Plan and provided comments. <br />DISTRICT ENGINEERS PERMIT REVIEWS - CENTRAL BROWARD WATER CONTROL DISTRICT <br />Technical Support - Provided hydrologic-hydraulic expertise and reviewed technical issues regarding proposed projects. <br />SR-A1A RESURFACING PROJECT, PALM BEACH COUNTY, FL - FDOT, DISTRICT 4 <br />Project Manager for roadway improvements along AlA from Boynton Beach Inlet Bridge, to Lake Worth Road. The <br />project included major drainage study and improvements, milling and resurfacing, bridges, signal improvements, signing <br />and marking plans and coordination with endangered species and seagrass surveys, preservation of two historical <br />properties, and coordination of impacts to 4F (Boynton Beach Inlet Park) properties <br />DESIGN/BUILD FOR THE RECONSTRUCTION OF SE 3rd STREET, BELLE GLADE, FL - FDOT, DISTRICT 4 <br />Drainage Engineer - The scope included the reconstruction of SE 3rd Street between Martin Luther King, Jr. Boulevard <br />and G Avenue project. He was responsible for designing the entire drainage system, with French drains, new outfall, <br />control structures and prepared the drainage report and permitting packages. <br />NORTH ANDREWS GARDENS NEIGHBORHOOD IMPROVEMENT PROJECT, BROWARD COUNTY OFFICE OF <br />ENVIRONMENTAL SERVICES <br />Engineer of Record - He performed drainage calculations for the FDOT drainage connection permit. <br />CM @ RISK FOR PARKER AND ATLANTIC BRIDGES REHABILITATION, BROWARD COUNTY, FL - FDOT <br />DISTRICT 4 <br />Project Manager for environmental permitting, MOT plans and utility coordination. <br />NW 87th AVENUE (SR-973/GALLOWA Y ROAD) MIAMI-DADE COUNTY, FL - FDOT, DISTRICT 6 <br />Engineer of Record - He was responsible for the drainage plans and preparation of the Bridge Hydraulic Report. <br />PALM AVENUE - CITY OF HIALEAH, FL <br />Engineer of Record, for drainage design - He finalized permitting, quality control reviews, and specifications, including <br />specialty items, such as street clocks. <br />NW 44th STREET - CITY OF LAUDERDALE LAKES, FL <br />Engineer of Record for drainage and permitting. <br />AREA WEST OF US 1 DRAINAGE STUDY - CITY OF HALLANDALE BEACH, FL <br />Drainage Engineer - He prepared a master drainage study to develop alternatives to resolve and mitigate flooding <br />problems. <br />NE 32nd/33rd AVENUE, NE 17th AVENUE - CITY OF FORT LAUDERDALE, FL <br />Drainage Engineer - He was responsible for the development and improvement to the drainage system and in charge of <br />reviewing reports and calculations. <br />US-I EXCLUSIVE BUS LANES - MIAMI-DADE COUNTY, FL <br />Drainage Engineer - Performed the Bridge Hydraulic and Scour analyses for three South Florida Water Management <br />District (SFWMD) canal crossings. Supervised and implemented the drainage system design. <br />KROME AVENUE, BRIDGE HYDRAULIC REPORT (BHR) MIAMI.DADE COUNTY, FL - FDOT, DISTRICT 6 <br />Engineer of Record - Responsible for the preparation of a hydraulic report for Krome Avenue Bridge. <br />SR-874 DRAINAGE MASTER PLAN T A 874-04 - MIAMI DADE EXPRESSWAY AUTHORITY <br />Senior Drainage Engineer - Responsible for the development of existing condition drainage maps for SR 874 Drainage <br />Master Plan. He led the stormwater model development, utilizing stormwater master planning and modeling drainage <br />software (AdICPR). <br />US-1/SR-5 HOLLYWOOD BOULEVARD TO SHERIDAN STREET - FDOT, DISTRICT 4 <br />Drainage Engineer - Task manager to evaluate required drainage improvements under a resurfacing, restoration and <br />rehabilitation (3R) project. <br />SW 2nd AVENUE - CITY OF FORT LAUDERDALE, FL <br />Drainage Engineer - He performed a review of the existing drainage system and proposed alternatives for <br />improvements. A report of the findings was completed and discussed with the City's staff. <br />CANAL J CULVERT - CITY OF CORAL SPRINGS, FL <br />Drainage Engineer who designed, permitted, and prepared plans for the construction of a 700 foot canal culvert. He was <br />also the project manager for the construction services of this assignment. <br /> <br />ql R.J.Behar <br /> <br />R. J. BEHAR & COMPANY, INC. I RFQ No. 11-11-02 I 5 <br />