Laserfiche WebLink
") <br /> <br />CITY OF <br /> <br />SUNNY <br /> <br /> <br />ISLES <br /> <br />BEACH <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />CARLOS MAZORRA, PE <br />ROADWAY DESIGN <br /> <br />EOUCA TIO N: B.S. Civil Engineering, University of Miami, December 1983 <br />PROFESSIONAL REGISTRATIONS: P.E. Florida No. 42653,1990 <br />TRAINI NG/CERTIFICA T IONS: Traffic Control Plan Training <br />YEARS OF EXPERIENCE: 24 Years YEARS WITH RJ BEHAR: 2004 - Present <br /> <br />ENGINEERING EXPERIENCE <br />Mr. Mazorra has been the Project Engineer/Manager for the preparation of numerous, very successful highway <br />construction plans. This included design of horizontal and vertical geometry with GEOPAK software. He has done <br />drafting plans, profiles, cross sections, traffic controls and various ancillary roadway plan sheets using MicroStation <br />software. Mr. Mazorra has designed roadway signal plans in collaboration with traffic engineering and structural <br />engineering personnel. He also has 11 years of experience as an FOOT employee and knows the policies and needs of <br />the FOOT from both a technical and managerial perspective, and can thereby assure the success of any project. At RJ <br />Behar, Mr. Mazorra is responsible for the design, project management and quality control for the Company's Highway <br />Group. He has 24 years of experience. <br /> <br />) <br /> <br />RELEVANT EXPERIENCE <br />DESIGN/BUILD P3 FOR 1-595 FINAL DESIGN - BROWARD COUNTY, FL - FDOT DISTRICT 4 <br />(AECOMIDRAGADOS) <br />Task Manager - He is in charge of the design and production of the signalization design of 12 intersections along SR-84 <br />for the reconstruction of the 1-595 corridor. <br />POWERLlNE ROAD (SR-845) PALM BEACH COUNTY, FL - FDOT, DISTRICT 4 <br />Project Engineer for the signal design. The project included milling and resurfacing 3 miles of a major collector, 8 signal <br />upgrades, safety improvements and miscellaneous drainage improvements. <br />NW 87th AVENUE (SR.973/GALLOWAY ROAD) MIAMI-DADE COUNTY, FL - FDOT, DISTRICT 6 <br />Project Engineer in charge of the signalization plans for the new construction and reconstruction of NW 87th Avenue from <br />NW 74th Street to NW 103rd Street in Medley, Florida. The scope of this project included roadway plans, drainage, traffic, <br />lighting, signing and marking, signalization and bridge plans. <br />SR.806 (ATLANTIC AVENUE) PALM BEACH COUNTY, FL - FDOT, DISTRICT 4 <br />Project Manager - Responsible for this milling and resurfacing (RRR) project of 3 miles of a major arterial, signal <br />improvements, safety improvements and miscellaneous drainage improvements. <br />SR.838 (SUNRISE BOULEVARD) NW 27th AVENUE, BROWARD COUNTY, FL - FDOT, DISTRICT 4 <br />Project Manager in charge of the design and production of roadway, signing and pavement marking, and signalization <br />plans. The scope of this safety improvement project is to mill and resurface NW 27th Avenue, as well as improve the <br />existing signalization system. <br />SR.838 (SUNRISE BOULEVARD) NW 31st AVENUE BROWARD COUNTY, FL - FDOT, DISTRICT 4 <br />Project Manager in charge of the design and production of roadway, signing and pavement marking, and signalization <br />plans. The scope of this safety improvement project is the addition of two left turn lanes, milling and resurfacing, and <br />pavement widening and the addition of two new signal mast arms. <br />NW 44th STREET - CITY OF LAUDERDALE LAKES, FL <br />Project Manager - Construction of a new 4-lane median divided facility. The project includes roadway plans, drainage <br />plans, privacy walls plans, and permitting, utility coordination and inspection services. <br />ATLANTIC BOULEVARD/ROCK ISLAND ROAD INTERSECTION IMPROVEMENT - BROWARD COUNTY <br />ENGINEERING <br />Project Manager - He prepared the traffic study, roadway plans, signalization plans, signage plans, drainage plans and <br />utility coordination for a major intersection improvement. <br />HILLSBORO BOULEVARD/MILITARY TRAIL INTERSECTION IMPROVEMENT - BROWARD COUNTY <br />ENGINEERING <br /> <br />rm.---UII R .J.Behar <br />U-1n <br /> <br />R. J. BEHAR & COMPANY, INC. I RFQ No. 11-11-02 110 <br />