Laserfiche WebLink
) <br /> <br />C [ T Y 0 F SUN N Y I S L E S B E A C H i~; <br />C I V I LEN GIN E E R I N G S E R V ICE S TO DES I G N S T R E ETA N D D R A I NAG ElM PRO V E MEN T S ."~:. <br />"~r..:"'o':..~"~ <br /> <br />Project Manager - He prepared the traffic study, roadway plans, signalization plans, signage plans, o. ,"" <br />drainage plans and utility coordination for this major intersection improvement. <br />HOLLYWOOD BOULEVARD/N. 28th AVENUE INTERSECTION IMPROVEMENT - BROWARD COUNTY <br />ENGINEERING <br />Project Manager - He prepared the traffic study, roadway plans, signalization plans, signage plans, drainage plans and <br />utility coordination for this major intersection improvement. <br />SR.820 (PINES/HOLLYWOOD BOULEVARD) FROM EAST OF 64th WAY TO WEST OF SR-?, BROWARD <br />COUNTY, FL - FDOT, DISTRICT 4 <br />Project Manager - Responsible for this milling and resurfacing (RRR) of the existing pavement; upgrading roadway signs <br />and curb ramps to meet current standards, upgrade pedestrian and signal features and Landscape improvements. <br />SR-836/SR.826 (SECTION 5) PLANS REVIEW - MDX (EAC CONSULTING, INC.) <br />Project Engineer - Reviewed roadway plans and provided comments. <br />SR-5/US.1 RESURFACING (BOCA RATON, FL) - FDOT, DISTRICT 4 <br />Project Manager - He was responsible for the milling and resurfacing (RRR) project of 1.4 miles of a major collector. <br />Upgraded pavement markings were included. <br />SR.5 (US-1/S0UTH FEDERAL HIGHWAY) DEERFIELD BEACH, FL - FDOT, DISTRICT 4 <br />Project Manager - He was responsible for the milling and resurfacing (RRR) of a major arterial; including safety <br />improvements. <br />SR-5 (BISCAYNE BOULEVARD) DOWNTOWN MIAMI- FDOT, DISTRICT 6 <br />Project Engineer in charge of signal and streetlight design in Downtown Miami. <br />SR.909 (WEST DIXIE HIGHWAY) - FOOT, DISTRICT 6 <br />Project Engineer in charge of signal and streetlight design. <br />SR.922 (96th STREET) - FDOT, DISTRICT 6 <br />Project Engineer in charge of signal design. <br />SR.934 (NW 81st/NE 82nd STREET) - FDOT, DISTRICT 6 <br />Project Manager for resurfacing and replacement of traffic signals and street lights. <br />SR.985/FLAGLER STREET INTERSECTION - FDOT, DISTRICT 6 <br />Project Engineer in charge of signal design. <br />HEFT MEDIAN SAFETY IMPROVEMENTS - FDOT TURNPIKE ENTERPRISE <br />Senior Highway Engineer in charge of the design of the construction, resurfacing and safety improvements. <br />SR.5 (US.1) ST. LUCIE COUNTY, FL - FDOT, DISTRICT 4 <br />Project Manager/ Engineer - RRR project in St. Lucie County, FL <br />SR.802 LAKE WORTH ROAD/MILITARY TRAIL INTERSECTION - FDOT, DISTRICT 4 <br />Project Engineer for RRR intersection improvements. <br />SR.824 PEMBROKE ROAD/72nd AVENUE INTERSECTION - FDOT, DISTRICT 4 <br />Project Engineer for RRR intersection improvement. <br />RAILROAD HAZARD BEACON - FDOT, DISTRICT 4 <br />Project Engineer -Installed hazard beacons at various locations districtwide. <br />SR.834 SAMPLE ROAD/NE 3rd AVENUE INTERSECTION - FDOT, DISTRICT 4 <br />Project Engineer for RRR intersection improvement. <br />SR.862/1.595 IMPROVEMENTS - FDOT, DISTRICT 4 <br />Project Engineer - Realignment of expressway entrance ramps. <br />SR.94 (KENDALL DRIVE) - FDOT, DISTRICT 6 <br />Project Engineer in charge of resurfacing and reconstruction. <br />COUNTYWIDE. MIAMI.DADE COUNTY, FL - FDOT, DISTRICT 6 <br />Project Engineer for traffic signal railroad preemptions. <br />SR.823 (NW 57th AVENUE) - FDOT, DISTRICT 6 <br />Project Engineer for complete reconstruction of 4-lane facility to 6-lane divided. <br />SR.5 (US.1) MATECUMBE KEY - FDOT, DISTRICT 6 <br />Project Engineer for resurfacing project on upper Matecumbe Key, Florida. <br />SR.976 (BIRD ROAD) - FDOT, DISTRICT 6 <br />Project Engineer for resurfacing and reconstruction. <br /> <br />" <br /> <br />'riR R.J.Behar <br />~lr~ . <br /> <br />R. J. BEHAR & COMPANY, INC. I RFQ No. 11-11-02 111 <br />