My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
R.J. Behar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 3:59:20 PM
Creation date
1/12/2012 3:47:54 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF <br /> <br />SUNNY <br /> <br />ISLES <br /> <br />BEACH <br /> <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />) <br /> <br />Per our communication with DERM, they recommend to research available files and obtain a <br />permitting review from the Coastal Resources Section of the Miami Dade County Permitting, Environment <br />and Regulatory Affairs (PERA) for this project. <br /> <br />RJ Behar has extensive experience in completing and obtaining permits with SFWMD, DERM and FDEP. <br />We recently completed the Seaboard Marine Redevelopment for the Miami-Dade Port Authority which <br />included more than 10 injection wells permitted with DERM and FDEP. <br /> <br />6. BID ASSISTANCE <br /> <br />RJ Behar will assist the City in obtaining bids and in the award of the Contract for the Work that was bid <br />pursuant to the Contract Documents, The assistance to the City could include furnishing the Contract <br />Documents for distribution to prospective bidders, schedule and conduct a Pre-Bid Conference, receive <br />and address inquiries from bidders, prepare and issue addenda as required. RJ Behar shall prepare a <br />tabulation of the bids received, analyze the bids and make a recommendation for responsive Low Bidder. <br /> <br />7. CONSTRUCTION MANAGEMENT/CONTRACT ADMINISTRA TION <br /> <br />Tasks that may be required during the Contract Administration are as follows: <br /> <br />a. RJ Behar will schedule and conduct a Pre-Construction conference with the City and the selected <br />contractor. RJ Behar shall provide the agenda and keep minutes. <br /> <br />) b. For the duration of construction, RJ Behar can provide a full time engineer or inspector to monitor <br />construction, In addition, the Project Manager will be available to visit to the site to inspect <br />progress. Daily construction progress reports and weekly summaries would be provided to the City, <br />and monthly meetings will be conducted with the contractor, City and Engineer, <br /> <br />c. RJ Behar shall review Contractor's shop drawings and verify accuracy prior to approving and <br />submitting to the City. <br /> <br />d. RJ Behar shall review Contractor's pay requests and verify accuracy prior to approving and <br />submitting to the City. <br /> <br />e. Testing of all storm sewer lines will be conducted in the presence of the Engineer. Embankment <br />and pavement compactions and densities will be conducted in the presence of the Engineer. All <br />required materials testing shall be witnessed by the Engineer, and all records relative to testing <br />shall be maintained by the Engineer. <br /> <br />f, The surveying and geotechnical consultants will be available on an as-needed basis to assist in the <br />certification of grades and testing of materials. <br /> <br />8. PROJECT FINALIZA TION AND CERTIFICA TION <br /> <br />RJ Behar shall review record "as-builts" to be provided by the contractor and prepare necessary <br />documentation for certification of the project to the agencies having jurisdiction over the different <br />elements. <br /> <br />qi R.J.Behar <br /> <br />R. J. BEHAR & COMPANY, INC. I RFQ No. 11-11-02 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.