Laserfiche WebLink
<br /> <br />1 <br /> <br />1 <br /> <br />l <br /> <br />rl <br /> <br />Chairman, Florida Institute of <br />Consulting Engineers, CEI <br />Committee. 2001 <br /> <br />Member, Florida International <br />University, School of <br />Engineering Advisory Board. <br />2003-2008 <br /> <br />rl <br /> <br />~ 1 <br /> <br />Member of the Florida Institute <br />of Consulting Engineers, the <br />Florida Engineering Society, the <br />National Association of Civil <br />Engineers and the National <br />Engineering Honor Society <br /> <br />t 1 <br /> <br />I I <br /> <br />YEARS EXPERIENCE <br />33 <br /> <br />r 1 <br />J <br /> <br />I ' l <br /> <br />, J <br /> <br />, J <br /> <br />, I <br /> <br />. I <br /> <br />~~+.+ <br />~+~+++ <br /> <br />CSA Group <br /> <br />· Sawgrass Expressway, Broward County. A $7 M resurfacing and widening project of a four lane divided <br />expressway. <br />· Tallahassee Road Project, Miami-Dade County. A $7 M widening of urban arterial roadway in Miami. <br />· Quail Roost Drive, Miami-Dade County (April 1999). An $8 M urban widening and reconstruction project <br />including drainage, paving, signalization, and lighting. <br />· 1-95 and Ives Dairy Road, Miami-Dade County. This $8 M project consisted of widening and reconstruction <br />of access ramps and bridges over 1-95 and CSX Railroad at Ives Dairy Road. <br />· Omni Stations, Miami Metro-Mover Extension, Miami-Dade County. This $15 M project consisted of the <br />construction of six elevated metro-mover stations, bus transfer area, and a vehicle wash facility. The <br />project followed very high standards imposed by the Federal Transit Agency for mass transportation <br />projects. <br />· Florida Turnpike between Bird Road and Kendall Drive, Miami-Dade County. The widening of this segment <br />of the Florida Turnpike included six bridges and the construction of two new ramps for the Kendall Drive <br />interchange. <br />· Florida Turnpike. Responsible for the value engineering study that replaced the reinforcing earth wall <br />system with the back retaining wall while maintaining traffic through construction thus avoiding Turnpike <br />bridge closures as originally planned. <br />· 1-75 and S.R. 29 Interchange. Construction of S.R. 29 overpass over 1-75 including all access and egress <br />ramps and drainage canals. <br />· Palmetto-Phoenix Farms and Town of Golden Beach Sewer System. Projects involved the installation of <br />complete sewer systems, pump stations, and force mains for a total of over 100,000 LF of pipe. <br />· Tri-County Commuter Rail Stations at Golden Glades and Palm Beach. These tri-rail stations were built <br />maintaining railroad traffic and following a fast paced construction schedule. <br />· Road Widening Projects. Responsible for several road widening projects in Miami-Dade and Broward <br />Counties, including drainage systems up to 72" diameter. <br />· Bridge Construction and Widening Projects. Responsible for the widening or replacement of several <br />bridges in Miami-Dade and Broward County. <br />· Commercial and Industrial Projects. Responsible for the construction of a 200,000 square foot office <br />building in Washington, D.C. and acted in an engineering supervisory capacity in the Amuay Refinery <br />Upgrade, Venezuela, as well as the Bahia Blanca Thermoelectric Power Plant, Argentina. <br />· Development Feasibility Studies. Acted as a consultant for several commercial and residential <br />developments in Florida, including the preparation of preliminary development plans, development of cost <br />estimates, feasibility analysis, and financial projections. <br />· Constructability Reviews. Responsible for constructability reviews of multiple road and bridge projects <br />including road reconstruction and widening of SR 60, SR 78, SR 80, SR AlA, US 1 and 1-95. Also <br />responsible for constructability review of bridge repair and rehabilitation projects of bascule bridges over <br />the Intercoastal Waterway and the Sunshine Skyway Bridge. <br />· Construction Claims, Dispute Resolution and Litigation Support. Directly responsible for documentation, <br />preparation, negotiation of construction claims and litigation support under Federal, State, and County <br />contract provisions, including the preparation of CPM analysis of delays and schedule impact, as-built <br />schedules, project records and delay-causing events, with the determination of activities and type of delay <br />suffered. <br /> <br />Sustalnabllity I Operations & Maintenance I Construction Management I Consulting I Environmental I Architecture & Engineering I Program Management <br />