My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
CSA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 5:06:27 PM
Creation date
2/8/2012 5:02:19 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs.
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 <br /> <br /> <br />1 <br /> <br />l <br /> <br />~l <br /> <br />including the addition of a paved median or two-way left tum lane to the existing two-lane and three-lane <br />undivided roadway sections of SR 5 (US 1) / Overseas Highway. Approximately one mile of improvements <br />begin just south of the intersection of Ships Way and extend north to Key Deer Blvd. <br />. Big Pine Key Post Design Services <br />· Palmetto Expressway (SR 826) @ NW 74th Street Interchange from N.W. 62nd Street to FEC Railroad, <br />Miami-Dade County, FL - Mr. Garganta was the Project Manager for the mainline widening and interchange <br />reconstruction facility of a limited access facility from 8 to 10 lanes with provisions to HOV, ITS <br />consideration including the addition of one lane in each direction between the Okeechobee Road/South <br />River Drive interchanges and just south of NW 74 Street; the construction of a f1yover ramp from <br />westbound Okeechobee Road to southbound Palmetto Expressway; the reconstruction of the bridges over <br />Okeechobee Road/South River Drive and NW 74 Street; the reconstruction and widening of all ramps; the <br />construction of two bridges over the Miami Canal between Okeechobee Road and South River Drive; the <br />widening of bridges over the FEC railroad tracks and Metrorail; the construction of a ramp over Metrorail; <br />and improvements to the barrier wall, drainage, signing and pavement markings, lighting, and signage. <br />Reduced speeds, lane closures, and lane shifts. Client: Florida Department ofTransportation. <br />· SR 836 Design Build from N.W. 72nd Avenue to N.W. 57th Avenue, Miami-Dade County, FL - The <br />proposed improvements consists of adding an auxiliary lane in the eastbound direction between the N.w. <br />72 Avenue Interchange and the N.W. 57 Avenue Interchange. The improvement consisted of widening to <br />the outside with a 12' lane and the existing bridge over the railroad track utilized the existing shoulder as <br />the auxiliary lane. Client: Miami-Dade Expressway Authority. <br />· Golden Glades Toll Plaza Improvements, Miami-Dade County, FL - Mr. Garganta was the Project Manager <br />for the addition of one toll lane in each direction including public involvement. Client: Florida Department <br />ofTransportation, Turnpike District. <br />· 1-95 between N.W. 129th Street and N.W. 151 Street, Miami-Dade County, FL - Mr. Garganta was the <br />Project Manager and Chief Designer for the widening of 1.5 miles of an interstate limited access facility <br />from 8 to 10 lanes. The project included the reconstruction of three interchanges. Client: Florida <br />Department ofTransportation, District Six. <br />· 1-75 from Palmetto Expressway to 1-595, Miami-Dade/Broward Counties, FL - The project comprised the <br />preliminary design and PD&E Study of an 18-mile, 8-lane limited access facility including 2 system <br />interchanges and 7 service interchanges. <br />· 1-75 and Sheridan Street Interchange, Broward County, FL - The project comprised the final design of a 2- <br />mile segment of an 8-lane limited access freeway and a service interchange. <br />· 1-75 and S.R. 826, Miami-Dade County, FL - The project comprised the final design of a fully directional <br />system to a system interchange. <br />· 1-85 - The project comprised the preliminary design of the widening of an 8-mile limited facility including a <br />service interchange. <br />· 1-595 and U.S. 1, Broward County, FL - The project comprised the final design of an 8-lane limited access <br />freeway including one service interchange. <br />· Turnpike from S.R. 80 to PGA Boulevard, Palm Beach County, FL - The project consisted of safety <br />improvements to a 10-mile section of a 4-lane limited access toll facility. <br />· Value Engineering Analysis - Performed value engineering analysis for nine limited access freeways. <br />· 1-95 Downtown Connector, Miami-Dade County, FL - The project consisted of the preliminary design for <br />upgrading an interstate connection to Downtown Miami. <br />· 1-95 and S.R. 826 Interchange, Miami-Dade County, FL - The project comprised the preliminary study of <br />system-to-system interchange improvements. <br /> <br />~l <br /> <br />~l <br /> <br />l <br /> <br />~ I <br /> <br />I ~ I <br /> <br />, I <br />. J <br /> <br />, t <br />, j <br /> <br />, I <br /> <br />, I <br /> <br />I r' <br /> <br />, I <br /> <br />, J <br /> <br />, J <br /> <br />PD&E STUDIES <br />· S.R. 924 (Gratigny Parkway) West Extension from S.R. 826 (Palmetto Expressway) to Homestead Extension <br /> <br />~t.~. <br />...... <br /> <br />CSA Group <br /> <br />, J <br /> <br />Sustainablllty I Operations & Maintenance I Construction Management I Consulting I Environmental I Architecture & Engineering I Program Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.