Laserfiche WebLink
<br /> <br />1 <br />1 <br />1 <br />rl <br />~ 1 <br />~ I . <br />l <br />, I <br />~ I <br /> . <br />'I <br />l I <br />, I <br />l I <br /> . <br />r I . <br />l I <br /> . <br />. I <br />, J <br /> . <br /> . <br />, I <br /> . <br /> <br />l J <br /> <br />l I <br /> <br />~~~. <br />...... <br /> <br />CSA Group <br /> <br />of Florida's Turnpike (HEFT) PD&E Study, Miami-Dade County, FL - The project proposes an extension of <br />S.R. 924 as a limited access facility west to the HEFT and seeks to maximize the opportunities for transit <br />connections with the existing 1-75 and the Palmetto Expressway with the proposed SR 924 East extension <br />to 1-95. The services include technical analysis of alignment alternatives, community and agency input <br />and outreach and the selection of a final alignment. Design elements include traffic engineering, <br />controlled aerial survey, and establishment of existing right-of-way, geotechnical, utility coordination, <br />controlled access highway design, roadway widening and reconstruction design, bridge analysis and <br />design, and maintenance of traffic planning. Consul-Tech will provide roadway design and surveying <br />services. Client: The Corradino Group. <br />95 & S.R. 9 PD&E Study from N. of Oakland Park Boulevard to South of Glades Road Improvements, <br />Broward County, FL - Mr. Garganta was responsible for engineering analysis, drainage, interchange <br />analysis for Project Development and Environment (PD&E) for interstate improvements including <br />additional lanes, interchange modifications, bridge replacement, and bridge widening as contained in the <br />MPO-Adopted 1-95/1-595 Master Plan Locally Preferred Alternative (LPA). The Master Plan adopts the <br />Broward County Long Range Plan and the Palm Beach County Long Range Plan for the 1-95 corridor. These <br />plans includes the widening of 1-95 north of Oakland Park Boulevard to Glades Road to increase the <br />mainline width to 10-lane wide with 8 general purpose lanes, 2 HOV lanes, and interchange <br />improvements. The general objective of this study is to provide and document information necessary for <br />the FDOT, hereafter referred to as the Department, to reach a decision on the type, design, and location of <br />improvements to alleviate the current traffic conditions, address capacity improvement needs, and <br />implement interchange modification solutions along 1-95 from South of Commercial Boulevard to South of <br />Glades Road, in Broward and Palm Beach counties. Client: The Corradino Group. <br />1-75 (S.R. 93) EMO Study, Miami-Dade/Broward Counties, FL - Mr. Garganta was responsible for the <br />engineering analysis, drainage, interchange analysis/SIMR and utility coordination for Project <br />Development & Environmental (PD&E) Study to plan for future projects to relieve existing and future <br />congestion along the existing 1-75 corridor. The project is approximately 22 miles in length and will include <br />the possible addition of reversible/special purpose use and auxiliary lanes, interchange improvements <br />and a dedicated transit way adjacent to the highway. Client: The Corradino Group. <br />S.R. 713 PD&E Study, Lee County, FL - Mr. Garganta was responsible for the quality control on the study of <br />a 10-mile rural facility. <br />Kendall Drive (SR 94) PD&E Study, Miami-Dade County, FL - Mr. Garganta was responsible for the PD&E <br />study to widening six miles of Kendall Drive from 4 to 6 lanes. <br />S.R. 112 PD&E Study, Miami-Dade County, FL - Mr. Garganta was the Chief Designer for the study of a 4- <br />mile, limited access expressway between 1-95 and N.W. 42nd Avenue including public involvement. The <br />project included 6 interchanges, 20 bridges, and several retaining walls. <br />S.R. 70, St. Lucie County, FL - The project comprised a PD&E study including public involvement, <br />preliminary engineering plans and right-of-way maps for a 17 -mile, 4-lane rural section. <br />Gratigny Parkway (SR 924), Miami-Dade County, FL - Mr. Garganta was responsible for the PD&E study of <br />a 4-lane limited access toll road including public involvement. The project included three interchanges. <br />Turnpike and Commercial Boulevard PD&E Study, Broward County, FL - Mr. Garganta was responsible for <br />the quality control on interchange design study. <br /> <br />PORT PROJECTS <br />· Port of Miami Access, Miami-Dade County, FL - The project comprised the preliminary study of a limited <br />access facility to the Port of Miami from 1-95 to 1-395. <br />· Port of Miami, Miami Dade County, FL - The project comprises the bulkhead design for the expansion of <br />the cargo area at the Port of Miami. <br />· Port of Miami, Miami Dade County, FL - The project consisted of drainage plans for the Main channel of <br />the Port of Miami. <br /> <br />Sustalnabllity I Operations & Maintenance I Construction Management I Consulting I Environmental I Architecture & Engineering I Program Management <br />