|
<br />'1
<br />
<br />__CORZO
<br />_CASTELLA
<br />CARBALLO
<br />rxm THOMPSON
<br />l.Tll:.ISAlMAN
<br />
<br />DIANA SUDASASSI-BILBAO. P.E.
<br />Traffic Calming
<br />
<br />'1
<br />
<br />EXPERIENCE
<br />
<br />r 1
<br />
<br />Mrs. Sudasassi-Bilbao, with over 14 years of experience, has been Project Engineer, Project Manager, and
<br />Engineer of Record on many traffic calming and roadway projects, and is responsible for the design and production
<br />of several municipal roadway improvement projects undertaken by the firm. She is experienced in developing
<br />residential, commercial and highway lighting and roadway plans. This experience includes implementation of
<br />traffic calming devices such as roundabouts and diverter islands, resurfacing and reconstruction plans, drainage
<br />design studies and reports, maintenance of traffic, signalization, lighting and signing and marking plans. She has a
<br />good drainage and lighting background with many of the local regulatory agencies. Some of her project experience
<br />includes:
<br />
<br />r 1
<br />
<br />r 1
<br />
<br />. Town of Golden Beach Capital Improvements, Golden Beach, Florida - Traffic Calming Engineer for this
<br />comprehensive Capital Improvements Program Master Plan which focuses on several major improvement
<br />areas: town-wide drainage improvements; utilities underground relocation (electrical, telephone, cable); town-
<br />wide streetscape & traffic calming; and renovation to the Town's existing Town Hall building. The Master
<br />Plan carefully considered the each of these with respect to feasibility, cost/benefit, and design, as well as an
<br />analysis of funding options and scenarios, and schedule for phasing and implementation.
<br />
<br />. Pinecrest Water main Master Plan and System Design, Pinecrest, Florida - Civil Engineer for this project
<br />which included the design of over 27 miles of watermain to complete the potable water system of the entire
<br />Village. The Master Plan was prepared that included a computerized model of the entire system and public
<br />workshops and meetings were held to inform and educate the residents of the extensive work and cost involved
<br />in the project. C3TS also prepared special taxing districts to better explain the finances of the project.
<br />
<br />. Crandon Boulevard Master Plan, Key Biscayne, Florida - Traffic Calming Engineer for this project that
<br />takes an existing suburban style highway and transforms it into a center of community activities. By
<br />promoting the safe and secure transit of all types of vehicles and pedestrians, this CPTED-friendly design also
<br />serves to create a source of identity for the community connecting retail, residential, public parks and
<br />government facilities into a cohesive design. The project consisted of a master plan that encompassed the
<br />design for a 4-lane divided road, improved public safety, easing of traffic congestion, traffic calming,
<br />pedestrianization, improved mass transit, streetscape improvements, sidewalks, lighting, and a roundabout.
<br />This project, divided into three phases, will provide the Village with a reference for the traffic and public
<br />safety impacts of future development or redevelopment of properties fronting Crandon Boulevard and its side
<br />streets.
<br />
<br />'I
<br />
<br />, ,
<br />
<br />I 1
<br />I
<br />
<br />'1
<br />. J
<br />
<br />, J
<br />
<br />I ,
<br />
<br />. Plantation Midtown Improvements and Greenway Transit Route (Phase I & II), Plantation, Florida -
<br />Senior Civil Engineer for streetscape design that will include the reconstruction of 2.5 miles of mixed use
<br />walkways, textured crosswalks, parallel parking, landscaped medians, and a roundabout at a key intersection of
<br />the City. As the first phase of a large project, C3TS' design will be the template for all improvements to
<br />follow in the City's midtown area. As part of the City's master plan, a greenway transit route for the entire
<br />midtown area is included. We have worked with the City in designing the route that the first phase of the bus
<br />transit will operate as well as helped them research the different type of transit vehicles available to them. In
<br />working hand in hand with the City on this issue, we are ensuring that the design we deliver meets the needs
<br />and expectations for the entire scope of their greenway project.
<br />
<br />. San Amaro Drive Traffic Calming Improvements, Coral Gables, Florida - Traffic Calming Engineer /
<br />Project Manager for the construction of San Amaro Drive and Campo Sano Avenue along the west and north
<br />boundaries of the University of Miami was a collaborative effort between the City of Coral Gables and the
<br />University. The project's primary goal was to slow down traffic along this 0.7 mile peripheral collector
<br />roadway, and provide pedestrian safety improvements. A series of traffic calming measures were employed,
<br />including lane narrowing, diverters, medians, landscaping, and a roundabout. A continuous sidewalk along the
<br />entire project length was constructed tying into the surrounding sidewalks in the neighborhood by way of
<br />decorative concrete crosswalks and corner sidewalk extensions.
<br />
<br />. South Miami Downtown Improvement Project, Phase I, South Miami, Florida - Senior Civil Engineer for
<br />the design, permitting, and construction of drainage and watermain improvements within the downtown South
<br />Miami area on SW 73rd Street, SW 58th Avenue, and SW 58th C01ll1. Improvements included a 12"
<br />watermain extension and new drainage systems. Responsibilities during construction included coordination
<br />with local merchants to minimize impact of construction on their business.
<br />
<br />. Yumuri Street, Monza Avenue & Venera Avenue Improvements, Coral Gables, Florida - Project
<br />Engineer for the development of roadway plans including drainage, utility coordination and pavement
<br />markings. Coordination of permitting requirements on behalf of the client. Responsible for transmittals, shop
<br />drawing reviews, preliminary cost estimates and construction plan clarifications.
<br />
<br />EDUCA TION
<br />Bachelor of
<br />Science in Civil
<br />Engineering,
<br />Florida
<br />International
<br />University, I994
<br />
<br />PROFESSIONAL
<br />REGISTRATION
<br />Florida
<br />Professional
<br />Engineer License
<br />No. 56926
<br />
<br />26
<br />
|