Laserfiche WebLink
<br />rl <br /> <br />__COR ZO <br />_CASTELLA <br />CARBAllO <br />= THOMPSON <br />~SALMAN <br /> <br />CARLOS M. HERDOCIA, P.E. <br />Signalization / Signing & <br />Pavement Marking <br /> <br />r 1 <br /> <br />EXPERIENCE <br />Mr. Herdocia has over 20 years of experience and has been Project Manager, Senior Design Engineer, and <br />Engineer of Record on various roadway projects for several municipalities in Miami-Dade, Broward, and <br />Palm Beach Counties. Some of these projects include: <br /> <br />. SW 2641h Street Improvements (US-l to SW 13ih Avenue), Miami-Dade County, Florida - Project <br />Manager and Senior Project Engineer (Engineer of Record) involved with the design for the proposed <br />street improvements for SW 264lh Street (approx. 0.74 miles). Design elements included a new <br />configuration for SW 2641h Street with a two lane divided roadway within an 80 foot right of way. The <br />proposed con-idol' design consisted of standard travel lanes, bicycle lanes, parking stalls with landscape <br />bump-outs after every second parking stall, a landscaped median, traffic separator, standard curb and <br />gutter, sidewalk, school bus drop-off, pavement marking and signage, roadway lighting and report, <br />school zone with applicable markings, signs and flashers, and modification of existing traffic signal at <br />US-I. Design elements of stormwater management included over 3,150 feet of exfiltration trench, 2,000 <br />feet of solid pipe, 45 drainage structures, pollution control structure with an emergency overflow into <br />Naranja Canal with a rip-rap end-wall and manatee grate. Services also included preliminary field <br />investigations, utility coordination, computation book, drainage report, detailed cost estimates and <br />permitting through DERM. <br /> <br />. West Kendall District Park (SW lsih Avenue and SW 120"' Street), Miami-Dade County, Florida <br />- Project Manager and Senior Project Engineer (Engineer of Record) involved with proposed new <br />roadway design and street improvements for Miami-Dade County. Design elements included over 4,600 <br />feet of exfiltration trench, 1,000 feet of solid pipe, 31 drainage structures, over 5,000 feet of 16" water <br />main with sub-aqueous crossing, roadway resurfacing, roadway lighting and report, new signalization <br />with mast arm configuration of existing intersection, over 1 mile of new roadway with sub base, base and <br />asphalt, sidewalk, guardrail, landscaped median, retaining wall, curb and gutter, pavement markings and <br />signs and coordination with structural department for design of proposed Bridge over a canal. Services <br />include the production of Grading and Drainage, Typical Sections, detail plans, preliminary field <br />investigations, utility coordination, computation book, drainage report and detailed cost estimates. Other <br />tasks included permitting through DERM, Miami-Dade Water and Sewer, Miami-Dade Fire Rescue, <br />Florida Depaliment of Health and acquisition of Right of Way permit through SFWMD. <br /> <br />r ) <br /> <br />'1 <br /> <br />, 1 <br /> <br />I I <br /> <br />, 1 <br /> <br />. , <br /> <br />, , <br /> <br />. Hialeah Street Improvements, Hialeah, Florida - Project Manager and Senior Roadway Engineer <br />(Engineer of Record) for the engineering design and preparation of construction drawings and <br />specifications for numerous roadway reconstruction projects in the City of Hialeah varying from 0.5 to <br />1.5 miles, and two- to five-lane sections. The improvements included geometry, earthwork, pavement <br />sidewalk, curb and gutter, raised median, drainage, lighting, pavement marking and signage. Some of the <br />projects include: <br />West 44'h PI. from West 10th Ave. to West 12'h Ave. <br />West 26th St. from West 52nd Ave. West 60th Ave. <br />West 33rd St. from Palm Ave. to East 4th Ave. <br />West 37'h St. from West of 16th Ave. to West 8'h Ave. <br />West 46'h St. from West 16'h Ave. to West 12th Ave. <br />West 56th St. from West 26'h Ave. to West 20'h Ave. <br />West 18th Ave. from Okeechobee Rd, to West 49th Ave. <br /> <br />- East 8th Ct. from East 45'h St. to East 49th St. <br />- East 8'h Lane from East 45'h St. to East 49th St. <br />- East 9th Ct. from East 45th St. to East 491h St. <br />- East 9'h Lane from East 45'h St. to East 49'h St. <br />- East 4yth St. from East 8'h Ave, to East lO'h Ave. <br />- East 2nd Ave. from East 33rd St. to West41" St. <br />- East 2211(1 St. to East 241h St. & East 9'h Ave. <br /> <br />. NW nnd Avenue from Okeechobee Road to NW 122nd Avenue, Miami, Florida - Project Manager <br />and Senior Project Engineer (Engineer of Record) responsible for design of 2.5 miles of roadway. <br />Project includes widening from two lane to four lane divided as well as installing new drainage on <br />existing four-lane section of the corridor. Also included are the reconstruction of sidewalks, curb and <br />gutters, upgrading 11 signalized intersections to mast arm configuration, and the installation of lighting. <br /> <br />. SW 6th Street Improvements, Sweetwater, Florida - Project Engineer on the design of approximately <br />0.5 miles of urban road resurfacing, sidewalk rehabilitation, drainage improvements, pavement marking <br />and signage, and landscaping plans. Responsibilities included Construction Administration and <br />Inspections. <br /> <br />. NE Innd Street Improvements, North Miami Beach, Florida - Project Manager and Senior Roadway <br />Engineer (Engineer of Record) on 0.8 mile roadway widening and resurfacing project including <br />pavement widening, overlay, curb and gutter, curbed islands, landscaping, drainage, on-street parking, <br />lighting, pavement marking and signage. <br /> <br />EDUCATION <br />Bachelor of <br />Science in Civil <br />Engineering, <br />Florida <br />International <br />University, 1988 <br /> <br />PROFESSIONAL <br />REGISTRATION <br />Florida <br />Professional <br />Engineer License <br />No.: 47660 <br /> <br />27 <br />