Laserfiche WebLink
<br />, 1 <br /> <br />__COR ZO <br />_CASTELLA <br />CARBALLO <br />= THOMPSON <br />UJ..CjSALMAN <br /> <br />RICHARD BLANCO, P.E. <br />Streetscape Design / Civil Engineer <br /> <br />'1 <br /> <br />EXPERIENCE <br />Mr. Blanco has over 17 years of experience in Civil Engineering, with project experience in drainage design, bridge <br />hydraulics, wastewater collection and transmission, drainage works, land development, parks, street improvements, and <br />industrial facilities. He has served as project engineer and project manager for governmental and commercial clients on <br />a wide variety of project assignments. He has extensive experience in sitework engineering for industrial and <br />commercial facilities, including design of drainage, wastewater collection and treatment, and enviromnental permitting. <br /> <br />. Town of Golden Beach Capital Improvements, Golden Beach, Florida - Project Engineer for this <br />comprehensive Capital Improvements Program Master Plan which focuses on several major improvement areas: <br />town-wide drainage improvements; utilities underground relocation (electrical, telephone, cable); town-wide <br />streetscape & traffic calming; and renovation to the Town's existing Town Hall building. The Master Plan carefully <br />considered the each of these with respect to feasibility, cost/benefit, and design, as well as an analysis of funding <br />options and scenarios, and schedule for phasing and implementation. <br /> <br />. Sunset Drive Improvements (West of US-I), South Miami, Florida - Senior Project Engineer for this master <br />planning project involving the development of conceptual streetscape and infrastructure improvements along <br />Sunset Drive from the western city limits to US-I. These include delineating intersections with concrete pavers and <br />crosswalks, redefining roadways sections, and providing new lighting and landscape design to increase public <br />safety and appeal. In addition, a new architectural site plan for City Hall was designed incorporating surrounding <br />public spaces and facilities to create an enhanced civic and community space. The master plan was developed <br />substantially in accordance with the City's Hometown Plan Area 2, and evaluated proposed improvements with <br />respect to their feasibility, cost/benefit, design, and construction. In addition, C3TS held three public workshops to <br />collect public opinions and suggestions, and ensured the Master Plan was sensitive to the community. <br /> <br />Crandon Boulevard Master Plan, Key Biscayne, Florida - Senior Project Engineer of design for this project <br />that takes an existing suburban style highway and transforms it into a center of community activities. By <br />promoting the safe and secure transit of all types of vehicles and pedestrians, this CPTED-friendly design also <br />serves to create a source of identity for the community connecting retail, residential, public parks and govermnent <br />facilities into a cohesive design. The project consisted of a master plan that encompassed the design for a 4-lane <br />divided road, improved public safety, easing of traffic congestion, traffic calming, pedestrianization, improved <br />mass transit, streetscape improvements, sidewalks, lighting, and a roundabout. <br /> <br />r 1 <br /> <br />, 1 <br /> <br />, 1 <br /> <br />, 1 <br />I <br />J <br /> <br />~ 1 <br /> <br />. <br /> <br />-l <br /> <br />Plantation Midtown North Streetscape & Roadway Improvements, Plantation, Florida - Senior Project <br />Engineer for streetscape design that will include the reconstruction of2.5 miles of mixed use walkways, textured <br />crosswalks, parallel parking, landscaped medians, and a roundabout at a key intersection of the City. As the first <br />phase of a large project, C3TS' design will be the template for all improvements to follow in the City's midtown <br />area. As part of the City's master plan, a greenway transit route for the entire midtown area is included. We have <br />worked with the City in designing the route that the first phase of the bus transit will operate as well as helped them <br />research the different type of transit vehicles available to them. In working hand in hand with the City on this issue, <br />we are ensuring that the design we deliver meets the needs and expectations for the entire scope oftheir greenway <br />project. <br /> <br />Phases IA & IB Water Main Extension / SW n"d to SW 801h Street and from SW 6ih Avenue <br />to SW 70lh A venue, City of South Miami, Florida - Project Engineer for this project which consisted of the <br />installation of approximately 2,640 lineal feet of8" D.LP. water main with associated fire hydrants, water meters, <br />valves, fittings, pavement restoration and I" pavement overlay throughout a residential conununity within the city <br />limits of South Miami. Although most of the project took place within residential streets, there was a need to tap <br />into an existing water main along a highly traveled road. This project site was visited at least twice a week and <br />sometimes even twice on one particular day. In addition to observing the on-going work, digital pictures were taken <br />at almost every visit to record the project progress. <br /> <br />. Indian Creek Village Improvements, Indian Creek, Florida - Project Engineer for this project in which C3TS <br />and Rosenberg Gardner Design (RDG) developed a Master Plan for the Village oflndian Creek through a series of <br />public presentations and workshops with the Village Council and residents. Based on the Master Plan, C3TS and <br />RDG have completed the Preliminary Design of the proposed improvements. These improvements include <br />reconfiguration of the Village entrance by tightening the corner radii, expanding the landscaped corners on either <br />side, creating an oval landscaped island, and historically restoring of the existing Gate House. The main roadway <br />into the Village will also be reconfigured by narrowing the travel lanes to l2-feet, introducing of a center <br />landscaped median, and a 5 ft. wide sidewalk for pedestrian and traffic safety. The main thoroughfare through the <br />Village will be reconfigured to introduce several safety improvements including: narrowing the road to inhibit <br />speeding, creating an 8-ft pathwav for pedestrians and bicvclists. and providing lighting along the pathwav. <br /> <br />. <br /> <br />. <br /> <br />EDUCATION <br />Master of Fine Arts <br />in Creative Writing <br />Florida <br />International <br />University, 1997 <br /> <br />Bachelors of Science <br />in Civil Engineering <br />Florida <br />International <br />University, 1991 <br /> <br />PROFESSIONAL <br />REG/STRA TlON <br />Florida <br />Professional <br />Engineer <br />License <br />No. 53135 <br /> <br />28 <br />