Laserfiche WebLink
k <br />�1 <br />) <br />r� <br />i <br />r) <br />b <br />f H <br />k ! <br />I! <br />This project involved the reconstruction of the drainage system, street improvement and the retrofitting of <br />the existing pumping station. BHA elected to use polyester liners and epoxy resins to rehabilitate more <br />than 9,100 feet of piping for its durability, strength and ability to perform under adverse climatic conditions. <br />Also the cure in place pipe (CIPP) solution is environmentally friendly to the sensitive Intracoastal <br />Waterway and does not require open trench excavation. At a $3.5 million construction cost, this is <br />considered to be the largest rehabilitation drainage project in the U.S. using epoxy resins. <br />