My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-01-03 Dev. plans and Survey for Temp Trailer
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 11:21:59 AM
Creation date
2/15/2012 11:19:43 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Dev. plans and survey for Temp Trailer
Bid No. (xx-xx-xx)
12-01-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />The proposer shall obtain and pay for all licenses, permits and inspection fees required for this <br />project; and shall comply with all laws, ordinances, regulations and building code requirements <br />applicable to the work contemplated herein. Damages, penalties and or fines imposed on the <br />City or the proposer for failure to obtain required licenses, permits or fines shall be borne by the <br />proposer, <br /> <br />Proposer shall include the cost for special inspections as required by the City's Building <br />Department in accordance with the most recent Florida Building Code and costs for certified <br />material testing, density testing, proctors, and reporting documentation to ensure compliance <br />with the plans and industry standards for quality control and assurance. <br /> <br />2.16 LIOUIDATED DAMAGES FOR INCOMPLETE PROJECTS <br /> <br />Failure to complete the project in accordance with the specifications and to the satisfaction of the <br />City within the time stated shall cause the consultant to be subject to charges for liquidated <br />damages in the amount of three hundred ($300,00) for each and every calendar day the work <br />remains incomplete. As compensation due the City for loss of use and for additional costs <br />incurred by the City due to such non-completion of the work, the City shall have the right to <br />deduct the said liquidated damages from any amount due, or that may become due to the <br />consultant under this agreement, or to invoice the consultant for such damages if the costs <br />incurred exceed the amount due to the consultant. <br /> <br />2.17 COMPLIANCE WITH FEDERAL STANDARDS <br /> <br />All items to be purchased under this contract shall be in accordance with all governmental <br />standards, to include, but not be limited to, those issued by the Occupational Safety and Health <br />Administration (OSHA), the National Institute of Occupational Safety Hazards (NIOSH), and the <br />National Fire Protection Association (NFPA). <br /> <br />END OF SECTION <br /> <br />City of Sunny Isles Beach I Request for Proposal No, 12-01-03 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.