Laserfiche WebLink
INTERNATIONAL GENERAL CONTRACTOR <br /> Project: Gateway Park-Performance Stage Date: 03/21/12 <br /> Location: City of Sunny Isles Beach,Florida <br /> Park Cost Estimate Summary <br /> (Incorporates City Requirements of 3/2/12;3/9/12 and 3/15/12) <br /> Code Unit(s) <br /> No. Item Description Designation /Unit Total Remarks <br /> Amount2000 SITEWORK <br /> Installation-Equip.&site related costs 1 UN 18,000.00 18,000.00 <br /> 3000 CONCRETE <br /> Conc./Masonry-Stage/[Nall/Backroom 1 UN 109,000.00 109,000.00 Including foundations <br /> 4000 MASONRY <br /> CMU-Included under Concrete 0.00 <br /> 5000 METALS <br /> Primary Support Columns 4 UN 7,000.00 28,000.00 <br /> Roof support system-Beams&Truss 1,800 SF 20.00 36,000.00 <br /> 6000 CARPENTRY/WOOD&PLASTIC <br /> Included under Concrete 0.00 <br /> 7000 THERMAL MOISTURE <br /> Metal Roofing 1,800 SF 22.00 39,600.00 <br /> 8000 DOORS&WINDOWS <br /> Not Applicable 0.00 <br /> 9000 FINISHES <br /> Stucco-Included under Concrete 0 0.00 <br /> Paint-Metal/Stucco 1 UN 15,000.00 15,000.00 <br /> 10000 SPECIALTIES <br /> Not Applicable 0.00 <br /> 11000 EQUIPMENT <br /> Not Applicable 0.00 <br /> Page 1 of 2 <br />