Laserfiche WebLink
Park Cost Estimate Summary <br /> (Incorporates City Requirements of 3/2/12;3/9/12 and 3/15/12) <br /> Code Unit(s) <br /> No. Item Description Amount DesignationCost/Unit Total Remarks <br /> 12000 FURNISHINGS <br /> Not Applicable 0.00 <br /> 13000 SPECIAL CONSTRUCTIONS <br /> Not Applicable 0.00 <br /> 14000 CONVEYING SYSTEMS <br /> Not Applicable 0.00 <br /> 15000 MECHANICAL <br /> NC System(Installed) 1 UN 10,000.00 10,000.00 <br /> HC Restroom at backroom 1 UN 19,800.00 19,800.00 Including war&sewer <br /> connection <br /> 16000 ELECTRICAL <br /> Electrical work/Panels 1 UN 40,000.00 40,000.00 <br /> Lighting 1 UN 60,000.00 60,000.00 Allowance <br /> SUB-TOTAL $375,400.00 <br /> Contingency $9,385.00 <br /> General Conditions $38,478.50 <br /> Gen.Liability Insurance $5,925.69 <br /> GC Overhead/Fee $21,459.46 <br /> TOTAL HARD COST $450,648.65 <br /> A/E 8,Consultants Professional Fees $45,064.86 <br /> Letter of Credit $4,957.14 <br /> PROJECT TOTAL $500,670.65 <br /> ROUNDED PROJECT TOTAL $500,000.00 <br /> Notes: <br /> 01- Estimated project costs does not include the following: <br /> Land acquisition cost. <br /> Sound System Design/Installation/Equipment <br /> Testing fees. <br /> City/Agency fees. <br /> Relocation of existing elect. poles. <br /> Upgrades to existing utilities. <br /> Environmental related issues and/or work. <br /> Demolition of existing structures,utilities, underground constructions,etc. <br /> 02- Costs are subject to change based on final program,design and/or site conditions. <br /> Page 2 of 2 <br />