Laserfiche WebLink
<br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />- ) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br />) <br /> <br /> <br />'f Calvin. Giordano ~ Associates. Inc. <br />IEXCEPTIONAL SOLUTIONS <br />. <br /> <br />Robert Jackson, PSM, Page 2 <br /> <br />City of Pembroke Pine Boundary survey for a 167-acre parcel, Broward County, Florida. In addition <br />to the information provided by the client, research was required for adjoining ownerships and right-of-way <br />maps for 1-75 corridor as well. The survey was accomplished using and overall static GPS traverse that <br />included sectional work along with conventional sub-traverses utilized for finding or setting property <br />corners and locating improvements. At the completion of the AUTOCAD drawing all aspects of the project <br />were reviewed for completeness and compliance with Minimum Technical Standards (MTS). <br /> <br />Dania Cove, Dania Beach, Florida. Prepared a Boundary and Topographical survey that delineated mean <br />high water along the Dania Cut-Off Canal. All in accordance with the State of Florida minimum technical <br />standards for land surveys as defined by Chapter 5J-17.05 of the Florida Administrative Code. <br /> <br />City of Lauderhill, Florida, Storm Water 10cations-GPS:Project Manager responsible for all survey <br />aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning <br />System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure <br />the project was on time and on budget. <br /> <br />City of Weston, Florida, Sign Inventory-GPS (City of Weston Surveyor): Project Manager responsible <br />for all survey aspects of this project. Project involved locations of City signage. This included informational <br />signs and all traffic signs throughout the City. Survey Crews cataloged, height, type of sign and condition <br />with the Global Positioning System (GPS). Performed quality control throughout the project. Coordinated <br />weekly meetings to assure the project was on time and on budget. <br /> <br />City of Weston, Florida, Stormwater Improvements-GPS: Project Manager responsible for all survey <br />aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning <br />System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure <br />the project was on time and on budget. <br />