Laserfiche WebLink
<br />CH~RE <br />) I>.AS50CIAf 1'5 <br /> <br />Jose Luis Acosta, PE <br />Project Manager <br /> <br />Education <br />Masters of Business Administration, Master of <br />Business Administration, Auburn University, <br />2003 <br />Bachelor of Science, Civil Engineering, <br />University of Miami, 1999 <br />Bachelor of Science, Architectural <br />Engineering, University of Miami, 1999 <br /> <br />Registration <br />Professional Engineer, Florida, 63827, 2004 <br />Natl. Council of Examiners for Eng. & <br />Surveying, 41987 <br /> <br />Professional Affiliations <br />. American Society of Civil Engineers <br />. Cuban American Association of Civil <br />Engineers <br />. Florida Engineering Society <br />. National Society of Professional <br />Engineers <br />. Society of Military Engineers <br />. Urban Land Institute <br /> <br />Certifications <br />Stormwater Management Inspector <br /> <br />Summary <br />Jose Acosta, P.E. is a project manager and <br />leads Chen Moore and Associates' Miami <br />office. Mr. Acosta has over 12 years of <br />experience directing and performing the <br />design of site civil engineering plans/tasks, <br />including paving, drainage, water, <br />wastewater, roadway, and signing and <br />marking for several municipalities throughout <br />Miami-Dade, Broward and Palm Beach <br />Counties. <br /> <br />Project Experience <br />Sunny Isles Beach Active Park (Pelican <br />Community Park). The 2.5-acre active park <br /> <br />site design was designed to become the <br />premier recreational park for the City of <br />Sunny Isles Beach. The site is located at <br />18115 North Bay Road. The project included <br />full design services for the city orchestrating <br />park planning, paving, grading, drainage, <br />water, sewer, irrigation, landscape <br />architecture, architectural design, <br />government permitting and construction <br />administration services on a limited site. The <br />project included off-site drainage <br />improvements and coordination with adjacent <br />projects in construction. Amenities of the <br />park include the following: baseball field; <br />recreation building and gym with a <br />multipurpose court; playground area and <br />structure. This project represents Mr. Acosta's <br />experience while employed with another firm. <br /> <br />Miami Beach City Center Right-of-Way <br />Improvement Project. Chen Moore and <br />Associates is the prime consultant and was <br />responsible for providing surveying, planning, <br />geotechnical investigation, design, permitting, <br />preparation of construction documents, bid <br />and award and construction engineering and <br />inspection services for infrastructure <br />improvements within the public right of way <br />areas of the City Center neighborhood of <br />Miami Beach. The project encompasses <br />approximately 24,000 LF of ROW <br />infrastructure improvements including water <br />main replacements, sanitary sewer upgrades, <br />stormwater drainage improvements, paving & <br />grading, streetscaping enhancements, <br />landscaping improvements, lighting <br />improvements, and roadway reconstruction. <br />This project also required extensive <br />coordination with the Public, adjacent CRAs, <br />historic districts and various regulatory <br />agencies. <br /> <br />RFQ No. 12-04-04 Design and Permitting Services of the Intracoastal Parks <br /> <br />3-14 <br />