Laserfiche WebLink
EXPERTISE <br />AMAZIA L. KIBOKO, P.E., PTOE Sr. Engineer <br />Mr. Kiboko began at FRA in 1992 as an Engineer, he has been promoted since and is now <br />the Vice President of Design, Planning & Transportation. He has over 26 years of, "diverse <br />and well rounded experience" in the areas of traffic operations studies, transportation <br />engineering, planning, statistics, traffic signal timing, data collection and analysis, ITS, <br />roadway /highway design, signalization, signing, pavement markings, and utility <br />coordination. Mr. Kiboko routinely achieves NEARLY PERFECT scores on all the contracts <br />he manages for FDOT. <br />PROJECT EXPERIENCE <br />Roadway /Highway Design General Consultant Contract (sub), Port Everglades (2006 - Ongoing). FRA is currently <br />Signalization working at Port Everglades as a subconsultant to the General Consultant, we provide <br />miscellaneous services including Traffic Engineering, Minor Design and ITS services. <br />Lighting Design Under this project FRA is involved on the following project: Mcintosh Loop Road <br />ITS Realignment: This project consisted of detailed programming phase where traffic <br />Traffic Engineering circulation, Port and user operations, and future plans of the southport development were <br />Transportation Planning all analyzed to take account the best solution for the port. Tasks included meetings with <br />all involved Port departments and presentations to various stakeholders in order to build <br />EXPERIENCE consensus of the proposed alignment. The project deliverables were a report documenting <br />the traffic study, attending all necessary meetings, analysis and recommendations. <br />With FRA: 17 Years Contact: Mr. John Fogelsong, P.E. /Mr. Kevin Hart, P.E. - Craven & Thompson (954) 739 - <br />With Others: 9 Years 6400 <br />EMPLOYMENT Miscellaneous Traffic Engineering Studies, MDCPW (712001 - 7/2005, 2005 - 2008). <br />Joined FRA 07/1992 Mr. Kiboko serves as the Project Manager for this contract. FRA is responsible for <br />providing the Miami Dade County Public Works Department with professional traffic <br />EDUCATION engineering services through the development of various traffic engineering studies and <br />traffic data collection. Contact: Mr. Muhammad Hassan, P.E. Retired / Mr. Vishnu <br />B.S.C.E. Rajkumar (305) 375 -2078 <br />University of Dar-es - <br />salaam; Tanzania <br />(1983) <br />M.S.C.E. <br />University of Miami; <br />Coral Gables, FL <br />(1990) <br />Post Graduate University <br />of Trondeihm; <br />Trondheim, Norway <br />(1986) <br />REGISTRATION <br />Professional Engineer <br />Florida No. 49523 <br />(1995) <br />Professional Traffic <br />Operations Engineer <br />Florida No. 00024 <br />(2004) <br />F.Z. ALEMAN <br />& Associates, Inc. <br />CONSULTNG Et:G VEERS & SURWEYORS <br />District►vide Travel Time & Delay Study & Dlstrictwide General Planning Consultant (2 <br />Prime Contracts & 1 Sub), FDOT 6 (1/1998 - 612006). Mr. Kiboko served as a Sr. <br />Engineer for this contract. These contracts involved performing RCI /HPMS /SLD <br />regeneration, preparation of Base Map /RCI discrepancy packages, RHCI, routine traffic <br />counts, vehicle classification counts, PTMS, saturation flow & headway measurement, <br />vehicle delay, arterial travel time & delay, traffic /inventory data entry, origin- destination <br />surveys, condition diagram, vehicle gap measurement, spot speed measurement, design <br />traffic, vehicle occupancy survey & general statistics support including providing on -site <br />support and on -site equipment, GIS (training), mapping, GPS, IMRs, jurisdictional roadway <br />transfers, functional classifications, etc. Contact: Mr. Rafael de Arazoza, P.E./ Mr. Ernesto <br />Polo, P.E. No Longer with FDOT <br />Districtwide Traffic Operations Safety Studies, FDOT 6. Mr. Kiboko served as a Sr. <br />Engineer developed for FRA project management purposes, an automated Crash Analysis <br />Package using Visual Basic Programming. This program automatically extracts accidents <br />from FDOT's mainframe and produced riot only crash surnmaries but also crash analysis <br />and collision diagrams in Excel. This Innovative Crash Analysis Package has resulted in a <br />cost savings for the Traffic Operations Safety group in District 6. He also serves as the <br />Project Engineer in charge of the day -to -day activities in providing highway safety <br />studies /reports that identify and quantify safety problems, develop cost effective <br />treatments and recommend appropriate solutions. Contact: Mr. Carlos Francis, RE No <br />Longer with FDOT <br />Districrivide Traffic Operations Data Collection, FDOT 6. Mr. Kiboko served as the Project <br />Manager for this contract that involved providing FDOT with data collection to support <br />traffic operations functions. Such data includes: traffic counts, RCI /HPMS, origin - <br />destination surveys, travel time and delay surveys, trip generation, saturation flow, <br />parking, accident/safety, traffic conflicts, spot speeds, and project traffic reports. Contact: <br />Mr. Alfred Nolton (305) 470 -5335 <br />